A Study on Construction Management with Focus on Public Construction and Maintenance Management

DOI : 10.17577/IJERTV7IS030217

Download Full-Text PDF Cite this Publication

Text Only Version

A Study on Construction Management with Focus on Public Construction and Maintenance Management

Davidson Rajan Philip

M Tech Scholar Department of civil Engineering

Dr. M. G. R Educational and Research Institute University, Maduravoyal, Chennai, Tamil Nadu

Ashok Kumar

Assistant Professor, Department of Civil Engineering

Dr M.G.R Educational and Research Institute University, Maduravoyal, Chennai, Tamil Nadu

Abstract Maintenance management of structures is a big try for the owners and managers in many countries with aging civil infrastructure. It is not easy to change or perhaps heal, all structures because of the really extensive escalate and disposal of such infrastructure, and its associated costs. A building exists to serve the user's time obligation. The special intention of maintenance is, to overemphasize the mean life of a building, by delaying deterioration, decay and failure. Building maintenance management is a complex process that involves planning, directing, governing and organizing resources for the livelihood of the building's functional opera. This paper outlines the most important looks of maintenance management systems, reflect on the most competitive practices in Chennai and highlight the state of the art in this area. It is seen through case studies integrating structural strength monitoring in the maintenance management systems is promising in rationalizing decisions that are needful for the benefit owners embarrassed by the scarce resources.

Keywords Maintenance management, Associated costs, Structural strength.

  1. INTRODUCTION

    Maintenance is defined as a work done to keep the civil engineering structure in a working condition, to enable them to carry out the functions for which they are constructed. Maintenance and Management are two closely related issues. Building management, apart from covering the basic security and cleanliness aspects of buildings, should also coordinate or even include implementation of maintenance plans to ensure a safe and pleasant living environment. surveillance can be strategically combined with inspection for maintenance. It would be beneficial to owners in engaging the same personnel in carrying out both duties. Defects create hazards leading to serious or fatal injuries. Most defects can, at their early stages, be discovered through visible or detectable symptoms. If not promptly rectified, minor defects can develop into serious ones, causing failure or sudden collapse, endangering lives and becoming more costly to rectify.

  2. OBJECTIVES

    • Prevention of damages due to natural agencies and keep them in good appearance and working condition

    • To repair the defects occurred in the structures and strengthen them if necessary

    • To extent the useful life of the building and prevent premature capital outlay of replacement.

    • To satisfy lender/insurer requirement to provide a safe secure and efficient working and living environment and to avoid deterioration of physical assets.

    • To maximize the aesthetic and economic values of the building as well as increase the health and safety of the occupants.

  3. SCOPE

    • To study the management techniques and repair methods used in rehabilitation of concrete structures.

    • To analyze the defects in the existing building.

    • To understand the latest repair methods and materials used for repair and rehabilitation of the structures.

    • To find out the ways to repair and increase the durability if the building.

  4. METHODOLOGY

    1. General

      This project mainly focus on preventive maintenance. The experimental study was distinctly divided into a definite sequences of the work for a factory at Tondiarpet, Chennai the canteen building situated inside the company was taken for repair and maintenance work. It is a G+1 building of 30 years old. The building had cracks and spallimg of concrete in columns. Five of the columns which were badly damaged were observed, repair and rehabilitation work is processed to stabilize the building.

    2. Detailed Investigation

    • Visual Examination – Experienced personal carrying detailed over view of the site.

    • Observations – To ascertain the defects and miniature detailing of the building

    • Planning – Making the schedule for the entire sequence of the work to be carried out for the project

    • Execution – Implementing the schedule that is prepared to complete the work at the exact time without any delay.

    • C. Tests carried out in the preliminary stage

    • Ultrasonic pulse velocity and rebound hammer test were done to assess the condition of concrete in the column, beam and slab in different areas. Profoscope is a fully integrated rebar locator with data storage used to increase the efficiency on the construction site it offers real time visualization of rebar's, and automatic data Test for chloride and carbonation has been carried out for checking the existing condition of the cover concrete. Half cell potential survey was carried out to find out the extent and severity of corrosion activity. Out to recognizing the degree and seriousness for corrosion activity. The extraction of core sampling and testing for compressive strength was carried out to assess the homogeneity and actual insitu strength of concrete. following which a repair methodology was suggested and the work was executed.

    1. Repair Methodology

      Sequence of work carried out for the Repair and rehabilitations of the building

      • Removal of brick work

      • Removing Plastering and cover concrete

      • Cleaning of bars

      • Additional Reinforcement

      • Shear connections

      • Core cutting

      • Application of chemicals

      • Concreting

        1. Epoxy Jointing compound

        2. Form work or Shuttering

        3. Concreting

        4. De-shuttering

        5. Curing

      • Redoing of Brick work

      • Plastering

    2. Sequence of Repair and Rehabilitation Methodology

    The column to be worked upon was isolated by removing the brick work around the column (Fig 1). After the removal of brick work the plastering of the column was removed by mechanical means. After exposing the core concrete with the corrode rebar's, the rebar's were thoroughly cleaned using rust remover agents. Additional rebar's were anchored in the columns to increase their durability by means of placing shear connectors using specialized chemical (Fig 2).After placing of additional reinforcements, the column was made ready for concrete with an epoxy bonding agent (Fig 3). Concreting was proceeded with a repair based material, micro concrete with powder aggregate ratio 1:0.5 (Fig 4) and applying AR compound after deshuttering (Fig 5) finished with redoing of brick work and plastering (Fig 6).

    Fig. 1. Removing brick work Fig. 2. Additional Reinforcement

    Fig. 3. Epoxy bonding agent Fig. 4. Concreting with micro concrete

    Fig 5 Applying AR compound Fig 6 Redoing of brick work and plastering

  5. PROJECT SCHEDULE

    The project schedule as stated by the site was worked on Microsoft project. The detailed schedule for one column is as stated below

    Fig. 7. Project scheduling using Microsoft Project for one column

    A. Microsoft project

    In this project the scheduling is been done using MSP. Microsoft Poject (MSP) is a project management software program. It is designed to assist project managers in developing plans, assigning resources to tasks, tracking progress, managing budgets, analyzing workloads. Project creates budgets based on assignment work and resource rates, Resources people, equipment and materials, Resources can be shared between projects using a shared resource pool Each resource can have its own calendar. Limitation of MS Project presumes additional physical raw materials are always available without limit. MSP powerful management tools with the right blend of Usability, Power, Flexibility. Through this we can manage projects more efficiently and effectively. MSP enables to stay informed and control Project work, Schedules, Finances and to keep project teams aligned. The estimated time taken for the completion of the project is 56 days for five columns at an expensive cost.

  6. CONCLUSIONS

    The repair and rehabilitation of Concrete structures are very challenging, now a day's Repair/Rehabilitation of concrete structure is comparatively a new subject in India. It is a real challenging task to carry out the repair/rehabilitation work, when structure has already undergone major structural damages/deterioration. As such, there is a requirement of periodical/timely assessment and maintenance with latest

    available techniques and materials as described in this paper. This will go a long way to arrest deterioration and extend the lease of life to the structure. As the time passes, many more concrete structures will come up for major rehabilitation. Time has come to have a structural auditing of all the old concrete buildings/structures, which were constructed during sixties and earlier. Depending on the severity of the environmental effect, the restorative measures can be selected. In a country like India, we cannot afford to spend money on replacing the building, which is against implementation of green building concept also. As such selection & evaluation of right repair material and protective coatings will save enormous money & time by reducing the frequent repair costs of already repaired concrete buildings/structures. To modify/improve the properties of concrete or mortar, a large number of polymers/admixtures have been tried and extensively used in other countries..Further, the repair/rehabilitation works should be undertaken only after ascertaining properly the cause of deterioration. It is imperative that the Engineer understands the reasons which led to damage and or deterioration prior to developing a repair programme Proper maintenance by means of frequent visual inspections can help us improve a lot.

  7. AKNOWLEDGEMENT

    The authors would like to thank all those who helped us in accomplishing this work. I thank God Almighty for His grace throughout the work.

  8. REFERENCES

  1. J. Bhattacharjee "Repair and Rehabilitation of RCC for sustainable development with case studies" Civil Engineering and Urban Planning: An International Journal (CiVEJ) Vol.3, No.2, June 2016.

  2. R. Vijayalakshmi, S. Ramanagopal1, R. Sathia and R. Arvindh Raj "Case Study on the Repair and Rehabilitation of G+3 Residential Apartment Located Near Sea Shore, Tamil Nadu, India" Indian Journal of Science and Technology, Vol 10(26), DOI: 10.17485/ijst/2017/v10i26/115874, July 2017.

  3. Muhammad Imran Rafiq "Structural health monitoring for maintenance management of deteriorating structures: Current practice and state of the art" 2nd International & 6th National Conference on Earthquake & Structures October 14-15, 2015, ACECR of Kerman, Kerman, Iran.

  4. Yuseni Ab Wahab 1 and 2Abd Samad Hasan Basari "Building Maintenance Management Preliminary Finding of a Case Study in Icym" Middle-East Journal of Scientific Research 17 (9): 1260-1268, 2013

  5. Varinder K Singh. 2013, Structural repair and rehabilita-tion of 3 no. (G+8) multi storeyed residential buildings, at ONGC colony at chandkheda, Ahmadabad, Gujarat. Procedia Engineering. 2013; 5:55- 64.