ABSTRACT

Alkassim Ahmed Sulaiman, Wunuken Carlos Solomon, Sani Umar Muhammad

Department of Mechanical Engineering Nigerian Defence Academy Kaduna

to 32.20C throughout the year, whereas Onne port is

This study investigated the performance of Pratt & Whitney (P&W) FT4A marine gas turbine engine installed on a Frigate named Nigerian Navy ship Okpabana while voyaging from Onne port to Apapa port. The voyage route from Onne port to Apapa port consist of 6 voyage stations, namely; Onne Port, Bonny offshore terminal, Brass offshore terminal, Escravos offshore terminal, Lekki deep sea port and Apapa port. The meteorological data of the stations were obtained from National Aeronautics and Space Administration (NASA). The performance analysis was carried out using a Gasturb 11 gas turbine simulation software. The ship sailing at an average speed of 10 knots covers a total distance of 416 nautical miles (nm) between Onne port and Apapa port in about 38 hours and 53 minutes. The gas turbine engine parameters, such as rated power output, specific fuel consumption, thermal efficiency, turbine exhaust temperature, and fuel flow, were determined. The power output of the Pratt & Whitney FT4A gas turbine engine at various voyage stations was between 25.46 and 25.54 MW with the maximum and minimum values obtained at Escravos and Bonny offshore terminals respectively. The specific fuel consumption of the Pratt & Whitney FT4A gas turbine engine at various voyage stations was between 0.2326 and 0.2333 kg/kWh which was relatively high and low at 3 stations each. The thermal efficiency of the Pratt & Whitney FT4A at various voyage stations was between 33.849% and 34.789% with optimum performance at Onne port and Apapa port. The study shows the P &W FT4A engine performance output at the various voyage stations.

Keywords

Frigate, Pratt & Whitney FT4A, Gas Turbine Performance

  1. INTRODUCTION

    A gas turbine is a device that converts energy from a gas, often air, into rotational motion. [1]. In recent years, gas turbines are progressively being employed in a broad variety of applications such as electric power generation, airplanes, marine vessels, etc. for their ease of start, modular nature, and extensive operating flexibility [2]. Because the gas turbine engine is an air-breathing machine, ambient temperature, humidity, and altitude, which vary by geographical location and season, can have a significant impact on the density of the compressor input air that is inducted into it [3]. Apapa port is located at latitude 60 26' 43" N longitude 30 25' 34" E and has tropical weather, with temperatures ranging from 23.90C

    located at latitude 40 44' 39.6024" N longitude 70 2' 7.1376" E and has an average temperature of 21.70C to 30.60C.

    The Pratt & Whitney (P&W) FT4A Marine Gas Turbine Engine was developed by Pratt and Whitney aircraft is a common option for naval propulsion systems and other industrial applications [4]. The P&W FT4A gas turbine engine consists of a gas generator and a power turbine. This gas turbine consists of the basic machinery of the military and commercial versions of the JT4 jet engine. The power turbine replaces the jet nozzle of the aircraft engine and converts the energy of the hot gases to shaft power rather than to jet thrust. The power turbine is not mechanically connected to the gas generator shaft, but hot gas from the gas generator exits into the power turbine (free turbine) with a separate shaft connected to the loader (propeller) via reduction gear box simple but the aerodynamically coupled to the free power turbine. Accordingly, a frigate is a military warship classified by a nation, and it is typically employed to escort vessels in order to safeguard maritime lines of communication or as an auxiliary element of a strike group.

    The importance of this study cannot be overemphasized, as it enables the evaluation of the P&W MGT engine performance on a Frigate while voyaging from Onne port to Apapa port. The ambient weather parameters were used with GasTurb simulation software [5] to obtain the engine output performance result at various stations along the voyage route.

    The research objective is to evaluate the performance of the P&W FT4A marine gas turbine engine installed onboard a Frigate warship.

    Fig 1: A Picture of a Frigate Warship while Voyaging [6]

    Table 1: Characteristics of the Frigate [6]

    Parameters

    Design Values

    Displacement (tons)

    3,250

    Length (m)

    115

    Beam (m)

    13

    Draught (m)

    4.6

    Design Speed (knots)

    29

    Range (km)

    22,530

    Endurance (days)

    45

    Fig 2: A Gasturb Model of the Pratt & Whitney FT4A engine

  2. THERMODYNAMIC CYCLE OF AN IDEAL GAS TURBINE

    The Pratt & Whitney FT4A work based upon a modified Brayton cycle. It uses a continuous flow process where different components take air through various processes. The P-V and T-S diagrams are shown at Fig 3 and 4 respectively.

    Fig 3: Brayton cycle pressure volume diagram for a unit mass of working fluid. [7]

    Fig 4: Brayton cycle temperature entropy diagram for a unit mass of working fluid. [7]

    Fig 5: Gas turbine schematic showing relative points from the diagram for the Brayton cycle. [7]

    The Ideal Brayton cycle can be analyzed under four internally reversible processes as follows:

    Process 1 2: In this process, isentropic compression occurs. The air is compressed isentropically from low pressure (P1) to high pressure (P2), and the temperature rises from T1 to T2. In this process, no heat flow occurs. The turbine section drives the compressor section, which uses the turbine's energy to accelerate and compress the air.

    Process 2 3: In this process, constant (c) pressure heat addition occurs. Heat enters the system, raising the volume from V1 to V3 and the temperature from T2 to T3, while keeping the pressure constant at P2. The heat received is expressed as mcp (T3 T2). At that stage in the combustor, fuel is injected and burnt to convert chemical energy to kinetic energy.

    Process 3 4: In this process, isentropic expansion occurs. The air expands isentropically from P2 to P1, and the temperature decreases from T3 to T4. This method produces no heat flow. The expanding gases flow along a shorter exhaust path, resulting in a nozzle effect that increases the exhaust gases. The turbine section uses this energy to power the compressor section, which raises the specific volume while decreasing the overall pressure.

    Process 4 1: In this process, constant pressure heat rejection occurs. Heat is rejected from the system when the

    Substituting (3) and (4) into (6.3);

    1

    volume and temperature decrease from V4 to V1, but the pressure remains constant at P1. The heat rejected is

    = 1

    . (6.4)

    2

    expressed as mcp (T4 T1). At the end of the expansion phase, the residual gas in a closed cycle is routed via a

    The specific fuel consumption (SFC) is expressed as;

    3600

    cooler and returned to the compressor a air intake, and the cycle continues.

    =

    . (7)

    The thermodynamic equations for the gas turbine model is derived using the thermodynamic cycle in Figures 2 4 are as follows [8]:

    Compressor Power (12),

    1,2 = (2 1 ) (1)

    2

    1

    = 1 ( 1 ) . . . . . . . . . . . . . . . . . (1.1)

    Where is mass of the air (Kg/s), specific heat capacity of air (KJ/KgK), T2 Compressor discharge temperature OC, T1 Compressor inlet temperature OC

    In terms of pressure ratio, equation 1.1 becomes

    Where AFR is Air fuel ratio and Wnet is the net work done

  3. MATERIALS AND METHODS

    The materials deployed for the study are; Technical specification of the P&W FT4A marine gas turbine engine, Gasturb simulation software, meteological data of the investigated routes obtained from National Aeronautic and Space Administration (NASA), and sea online travel calculator. The Gasturb software was used imputing parameters such as ambient temperature, ambient pressure and relative humidity extracted from the meteorological data obtained from NASA.

    The Frigate was assumed to travel at a constant speed of

    10 knots and the journey lasted for 1.62 days which is a total of 38 hours 52 minutes and 48 seconds, over a total

    2

    1

    =

    1

    . . . . . . . . . . . . . . . . . . . . . . (1.12)

    distance of 416 nautical miles (nm). The locations of the various stations along the voyage routes; Onne Port,

    Where is Pressure Ratio and is the ratio of specific heats of the gas (Cp/Cv) also known as the isentropic index.

    1

    1,2 = 1 ( 1) . . . . .. . . . . (1.13)

    Heat energy added to combustion chamber (2,3),

    2,3 = (3 2) . . . . . . . . . (2)

    Where is the specific heat capacity of the gas (KJ/KgK), T3 Turbine inlet temperature OC,

    T4 Turbine exhaust temperature OC Noting that,

    Bonny offshore terminal, Escravos offshore terminal, Brass offshore terminal, Lekki deep sea terminal and Apapa Port, are shown on Figure 5.

    Gasturb software was further used to assess the performance of marine gas turbine engines by giving a detailed examination of collected data and providing performance prediction.

    1

    3 = 4 (3)

    and

    1

    2 = 1 (4)

    Equation 2 becomes

    1

    2,3 = (3 1 ) (5)

    Where is mass of the gas (Kg/s)

    Thermal efficiency of the cycle ( ) is expressed as,

    Fig 6: The Travel route of the investigated Frigate [9]

    Stations

    Onne Port

    Bonny Terminal

    Brass Terminal

    Escravos Terminal

    Lekki Deep Sea

    Apapa Port

    Ambient Temperature (oC)

    27.31

    27.78

    27.4

    27.65

    27.48

    27.32

    Ambient Pressure (kPa)

    100.8

    101.03

    101.14

    101.05

    100.97

    100.95

    Relative Humidity (%)

    86.31

    86.33

    86.65

    86.51

    86.11

    86.04

    Table 2: Annual Average Metrological data at various stations between Onne Port and Apapa Port for 2020 [10]

    =

    23

    . (6)

    (3 4 ) (2 1 )

    =

    (

    . (6.1)

    )

    3 2

    (3 2) (4 1 )

    =

    (3 2)

    2

    (4 1)

    . . . . . . . . . . (6.2)

    3

    = 1 (

    ) (6.3)

  4. RESULTS AND DISCUSSION

    The Gssturb software was used to model the P & W FT4A marine gas turbine with a gas generator with a twin spool and axial flow gas turbine engine and the performance of the gas turbine engine was analyzed. The annual average output parameters such as Power output, Thermal Efficiency, Specific Fuel Consumption (S.F.C), Exhaust Temperature and Fuel flow obtained at various voyage stations are shown in Table 3:

    Table 3: Average values of output parameters of the Pratt & Whitney FT4A GT Engine

    Ser

    Voyage Stations

    Annual Average Output Parameters

    Power Output (MW)

    S.F.C (kg/kWh)

    Thermal Efficiency (%)

    Exhaust Temp (oC)

    Fuel Flow (kg/s)

    1.

    Onne Port

    21.619

    0.2424

    34.789

    482.23

    1.4553

    2.

    Bonny Terminal

    21.574

    0.2428

    34.717

    482.46

    1.4548

    3.

    Brass Terminal

    21.635

    0.2425

    34.746

    482.34

    1.4574

    4.

    Escravos Terminal

    21.693

    0.2427

    34.746

    482.41

    1.4561

    5.

    Lekki Deep Sea

    21.608

    0.2426

    33.849

    482.34

    1.4558

    6.

    Apapa Port

    21.617

    0.2425

    34.772

    482.29

    1.4563

    1. Power Output

      The Power output at various voyage stations is presented in Fig 7 According to the data, the P&W GT engine generates roughly 21.6 MW of power at the start and finish of the test. The offshore terminals located in Escravos and Bonny generate the maximum power of

      21.69 MW and the minimum output of 21.57 MW, respectively.

      Fig 7: Rated Power Vs Voyage Stations

    2. Specific Fuel Consumption

      An alternative approach to determining the heat input per unit of effort is the specific fuel consumption (SFC). According to the conditions investigated, the results of the SFC for the P & W GT along the voyage route is presented in Fig 8. The SFCs of Lekki Deep Sea Port, Bonny Offshore Terminal, and Escravos Offshore Terminal were all relatively high. In comparison, the SFC

      of Onne Port, Brass Offshore Terminal, and Apapa Port was low.

      Fig 8: S.F.C Vs Voyage Station

    3. Thermal Efficiency

      Fig. 9 presents the results of the thermal efficiency showing the variation along the Voyage route. It indicates that 33.849% to 34.789% is the range of thermal efficiency. The results revealed that in Onne Port, Bonny offshore terminal, Brass offshore terminal, Escravos, and Apapa port, the P&W GT performed the best in terms of thermal efficiency. The study also indicated that it is the least efficient at Lekki Deep Sea Port.

      Fig 9: Thermal Efficiency Vs Voyage Stations

    4. Exhaust Gas Temperature

      Fig. 10 shows the result of the turbine exhaust temperature. The rate of exhaust gas temperature determines the thermal efficiency of a gas turbine. Based on the conditions under investigation, the average exhaust temperature for the P & W is 482.35 oC and the lowest was found to be at Onne Port. The exhaust temperature raised to the highest value at Bonny offshore terminal with slight variations at various stations along the voyage route.

      Fig 10: Exhaust Temperature Vs Voyage Stations

    5. Fuel Flow

      Fuel flow has a considerable influence on a gas turbine engine's performance and efficiency. Fig. 11 displays the fuel flow on aP&W GT along the voyage stations. Fuel flow was found to be relatively constant in Escravos, Lekki Deep Sea, and Apapa Port. The Brass offshore terminal had the highest fuel flow, while the Bonny offshore terminal had the lowest.

  5. CONCLUSION

    The study demonstrates how the Gasturb software was used to simulate the operations of a Frigate Warships P&W FT4A gas turbine engine as it sailed through several stations from Onne Port to Apapa Port. The GT performance parameters at various stations, such as power output, SFC, thermal efficiency, exhaust gas temperature, and fuel flow, were determined using the theories of the thermodynamic model. The varying meteorological conditions at various stations impact the performance of the GT engine.

    The engine's power output ranges between 25.46 and

    25.54 MW, with the greatest at the Escravos offshore terminal. The gas turbine's ideal thermal efficiency was 34.78%, which was reasonably good for the majority of the stations, with the exception of Lekki deep sea port, which had the lowest at 33.85%. The investigation also reveals that the S.F.C., which determines the heat input per unit, ranges from 0.2424 to 0.2428 kg/kWh. The study examines the performance of the modeled P&W FT4A GT with the Gasturb program. Therefore, further studies could be explored with advanced gas turbine engines.

    1. Razak, A. M. Y., 2007, Industrial Gas Turbine: Performance and Operability, Woodhead Publishing Limited, Abington, England.

    2. Google Maps., 2022, The stations along the voyage route on a map Google map [online] Available through: http://www.google.com. Accessed 14 January 2022.

    3. NASA Power, Prediction of Worldwide Energy Sources

    <https://power.larc.nasa.gov/>

  6. REFERENCES

  1. Breeze, P., 2016, Gas-Turbine Power Generation, Academic Press is an imprint of Elsevier, London, UK.

  2. Schobeiri, M. T., 2017, Introduction, Gas Turbines, Applications, Types, Gas Turbine Design, Components and System Design Integration, pp. 130.

  3. Bonet, M. U., Pericles Pilidis, and Georgios Doulgeris, 2018, Voyage Analysis of a Marine Gas Turbine Engine Installed to Power and Propel an Ocean-Going Cruise Ship, World Academy of Science, Engineering and Technology, International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 12(2), pp. 136142.

  4. Carlson, C. L., 1964, FT4A Gas-Turbine Engine for Marine and Industrial Applications.

  5. Gasturb 11 Simulation Software.

  6. NNS Okpabana Ships Data Book.

  7. Eiffel, A., 2015, Brayton Cycle: The Ideal Cycle for Gas-Turbine Engines, Academia.edu [Online]. Available:

https://www.academia.edu/9972055/Brayton_Cycle_The_Ideal_Cy cle_for_Gas_Turbine_Engines. [Accessed: 27-Oct-2024].