Value Stream Mapping and Waste Reduction Study of Pressure Cooker Body Manufacturing Across Aluminium, Stainless Steel, and Tri-Ply Lines

DOI : 10.17577/IJERTCONV14IS120017
Download Full-Text PDF Cite this Publication

Text Only Version

Value Stream Mapping and Waste Reduction Study of Pressure Cooker Body Manufacturing Across Aluminium, Stainless Steel, and Tri-Ply Lines

Ved Bhalerao

MBA, School of Business, Indira University,

Pune, India 411033 vedbhalerao237@gmail.com

Dr. Nitin Joshi

Associate Professor and Area Chair – MBA, School of Business,

Indira University,

Pune, India 411033 nitin.joshi@indirauniversity.edu.in

Dr. Hetal Bhinde

Associate Dean Ph.D. Programs, School of Business, Indira University,

Pune, India-411033 hetalb19@gmail.com

ORCID: https://orcid.org/0000-0002- 6435-5113

Abstract – In this competitive household equipment manufacturing sector, to have a good manufacturing excellent product it depends on eliminating waste, material streamlined flow, and strong delivery of quality. From decades of literature underscores Lean Manufacturing and Value Stream Mapping (VSM) as foundations of understanding and analyzing bottlenecks on shop-floor, improving throughput time, and driving methodological continuous improvement. This industrial study investigates the cooker-body manufacturing operations at ABC Cookers Limited across three primary product streams: ANODISED COOKERS Aluminum, Stainless Steel, and Tri-Ply. The primary objectives were to document upstream to downstream manufacturing workflows through VSM, segregate and analyze wastes using the TIMWOODS framework, evaluate material and information flows along with traceability which is QR based, diagnose quality rejections and process bottlenecks, and propose low-cost, practical and low-capital improvement solutions. Executed over an eight-week period from 15 June 2026 to 15 August 2026, the study methodology combined extensive operator interactions, Gemba walk, recording of cycle time, ERP transaction audits, and quality benchmarking against IS 2500 Part 1 acceptance sampling standards.

Investigation revealed that Non-value-added activities were predominate in logistics and administrative areas, with significant divergences around all product lines. The Tri-Ply line had transportation waste due to outsourcing from vendors located around 1,300 km away, whereas the ANODISED COOKERS and Stainless Steel lines experienced multi-processes and hoping, subcontract finishing delays. Across all lines, operations were carried by single-forklift unloading dependencies, paper-intensive four-copy challans for delievery, and untracked in process trolleys. Furthermore, In-house press operations contributed 3-4% out of a 5-6% combined plant rejection rate, high-volume circles lacked QR traceability which were not integrated to ERP. In conclusion plant productivity is

lacking because of space constraints, lack of material handling solution and loads of manual work .

To cut down lead times and tighten floor-level oversight, operations should prioritize several quick, cost-effective digital upgrades:

  • Automate Dispatch Paperwork: Link the ERP directly via API to generate digital delivery challans and e-way bills automatically, cutting manual administrative bottlenecks.

  • Instant First-Off Escalation: Set up digital Andon notifications to immediately alert supervisors when initial sample approvals stall, preventing line idling.

  • Mobile-Based Quality Audits: Move IS 2500 sampling protocols onto floor tablets or handhelds so inspectors log acceptance runs straight into the central database.

  • Traceable Packaging Assets: Tag heavy circles and returnable transport crates with scannable QR codes, establishing a closed-loop system that tracks transit cycles and eliminates missing inventory.

Targeting these high-friction handoffs with off-the-shelf digital tools delivers measurable inventory turnaround and process traceability without committing to a heavy, high- capex overhaul.

Keywords – Value Stream Mapping (VSM), Lean Manufacturing, TIMWOODS Waste Analysis, Pressure Cooker Manufacturing, QR Traceability

  1. INTRODUCTION

    This manufacturing landscape is defined by rapid shifts in technology, volatile costs of raw-materials, and intense competition across globe. To have an edge, house-hold equipment manufacturing organizations must aggressively pursue operational excellency, optimization of processes, and

    implementation of lean manufacturing. Pressure cooker manufacturing has a complex, multi-stage production system that integrates précised metal formingsuch as deep drawing, spinning, trimming, and lippingwith specialized subcontracted metal surface finishing, direct material component assembly, rigorous safety and quality testing, and multi-tier logistics. Because each operation compounds to overall cycle times and directly dictates consumer safety, eliminating non-value-added activities across the production lifecycle has become vital to have a long-term sustenance, reduce operational overhead, and preserve rigorous and must needed quality standards.

    Within the Indian cookers sector, ABC Cookers Limited represents an established benchmarking of product integrity, brand equity, and strict protocols of manufacturing. However, even within highly governed manufacturing atmosphere, operational friction and obstacles often emerge across informational and physical workflows. At the shop-floor, distinct multi-material product linesprincipally Aluminium (ANODISED COOKERS), Stainless Steel, and Tri-Ply variantsexperience various operational bottlenecks. This includes uncontrolled material handling, accumulation of excessive inventory , documentation which is paper-intensive, and uneven inspection quality frequencies. Furthermore, distinguished surface treatment subcontracting and the uneven adoption of direct material QR traceability create prominent visibility gaps between final dispatch, material dispatch and raw- material receiving.

    To address these challenges, this study presents an in-depth investigation into the cooker-body manufacturing value streams across ABC Cookers Limiteds primary product lines. Utilizing Value Stream Mapping (VSM) as the core investigating methodology, the research systematically tracks start to end information and material flows, separates value-added processes from the classic TIMWOODS wastes, and quality assurance audits checkpoints against standardized sampling frameworks. By alternating the workflow configurations, handling constraints, and cycle times of aluminium, stainless steel, and composite tri-ply bodies, this paper establishes a data-driven diagnosis. Ultimately, it provides actionable, practical, low-cost lean solutions and digital tracking enhancements designed to shorten production lead times, streamline plant logistics, and reinforce control on shop-floor operations.

  2. LITERATURE REVIEW AND THEORITICAL BACKGROUND

    1. Literature Review

      Infanteri (2018) analyses lean waste reduction in an aluminium cookware SME WIP, defects, motion, inventory, VSM, 5S, and Six Sigma. D. S. (2025) researched 5S, JIT, Kanban, and Kaizen in an Indian kitchen appliances manufacturer. Kaneku-Orbegozo et al. (2019) conducted a kitchen equipment production analysis, pointing out the presence of cutting and bending wastes, and achieving 13% cost savings; the second indexed record refers to the same study. Luan et al. (2021) assessed polishing tools for the improvement of aluminium cookware surface; Ealias et al. (2025) specified quality attributes of aluminium pots. Abdennadher et al. (2024) investigated coated-aluminium deep drawin and formability. Salsabila and Rochmoeljati (2021) and Arnando (2015) addressed lean waste reduction and quality improvement in stainless-steel processing. Karim et al. (2012) studied VSM in

      metal stamping, and Damsiar and Tjprc (2020) combined work study with lean methods in a metal-press line. Nivya (2016) examined forging VSM, while Murugananthan et al. (2014) mapped foundry flow. The research by Ravichandran (2015) optimized value ratio in pressure vessel forming process. VSM application in pumps manufacturing was reported by Dighe & Kakirde (2014). Jaiswal & Soni (2017) discussed VSM in small scale industries. The study in steel industry conducted in 2020 was based on non-value added activities. Inventory and delay management were the focus of the study carried out by Dewa & Lusiba (2018).

    2. Theoritical Background

    The research is rooted in Lean Manufacturing a production system approach based on Toyota Production System (TPS). Its key feature is the emphasis on creating customer value via eliminating all kinds of non-value adding activities. The analytical basis is made by Value Stream Mapping (VSM) visualization of material and informational flows from receipt to shipment. This process cycle times, changeovers and materials buffers distinguishing necessary transformations from operational inefficiency.

    Operational inefficiency in manufacturing lines is analysed according to the framework of the types of waste called TIMWOODS (Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and Underutilized Skills). Thus, transportation inefficiency is associated with delays, such as forklift dependence, manual transportation, unnecessary QR codes and excessive paperwork. Continuous improvements follow the scheme of the Plan-Do-Check-Act (PDCA) cycle and Kaizen approach, including low cost incremental shop floor improvements. In addition to this, workplace management issues are analysed using 5S (Sort, Set in Order, Shine, Standardize, and Sustain) method in order to deal with poor allocation and storage of subcontracted parts. Diagnostic tools, such as 5-Why technique and Ishikawa (Fishbone) analysis help to identify the root causes behind observed process inefficiencies.

    Lastly, the research combines Quality Management and the idea of a digital supply chain. The evaluation of process capability and quality management occurs using the acceptance sampling criterion (IS 2500 Part 1). The concept is further strengthened using ideas surrounding digital traceability, where the use of QR codes in minimizing errors associated with manual data logging and enhancing material visibility within the production process cycle is evaluated.

  3. MATERIALS AND METHODS

    1. Research Objectives

      This study evaluates cooker-body manufacturing across ABC Cookers Limiteds primary material lines to achieve five core objectives:

      1. Using Value Stream Mapping (VSM document the start- to-end manufacturing process from raw material receiving to final dispatch of product

      2. Identify value-added and non-value-added activities while classifying wastes using Lean Methodology (TIMWOODS)

      3. Analyse material, information flows, quality inspection processes, and QR-based traceability at all manufacturing stages

      4. Evaluate process bottlenecks, delays, quality issues, and operational challenges affecting efficiency

      5. Formulate feasible process improvement solutions aimed at enhancing throughput, eliminating waste, standardize quality, and strengthen overall performance of operations.

    2. Research Design and Data Collection

      The application of the industrial case study was performed by conducting this on the shop floor for a duration of eight weeks between 15 June 2026 and 15 August 2026. Primary data collection was done via the performance of the Gemba walk, process tracking, time studies involving the use of calibrated stopwatches to measure the cycles of operations, and semi- structured interviews with line operators, supervisors, and process engineers. The secondary data were collected from plant layouts, standard operating procedures, ERP transaction history, QR-Goods Receipt Record (GRR), and quality control logbooks. The study traced the full product transformation process from the receipt of raw materials, store staging, press shop processing (forming, deep drawing, trimming, spinning, lipping, and laser cutting), subcontracted finishing (buffing, anodizing, and sunray), incoming inspection, assembly, pressure testing, and dispatch packing.

    3. Analytical Framework and Quality Evaluation

    Value Stream Maps for the current state were developed for the ANODISED COOKERS Aluminium, Stainless Steel, and Tri-Ply product lines, which helped to identify the movement of materials, cycle time, manning, and flow of information. Inefficiencies in operations were identified using the TIMWOODS method of waste identification, and root cause analysis was done using Ishikawa and 5 Why methods to find out delays caused by internal movements, paperwork, and staging. Quality control activities were analysed against the standard of IS 2500 Part 1 acceptance sampling procedure, resulting in the development of check sheet to check dimensions, surface imperfections, and drawing defects.

  4. DATA ANALYSIS AND DISCUSSION

    Document Existing Manufacturing Process Using Value Stream Mapping (VSM)

    TABLE I.

    End-to-End Comparative Value Stream Mapping Across Product Lines

    Parameter / Operational Metric

    SKUs

    ANODISE D COOKERS

    (Aluminium

    ) Line

    Stainless Steel (SS) Line

    Tri-Ply Cooker Line

    Total Major

    Process Stages Mapped

    10 stages

    11 stages

    11 stages

    Body Forming Strategy

    100% In-

    house Press

    Shop operations

    Hybrid In- house (4 key

    forming steps)

    Fully outsource

    d forming operations

    In-House

    Press Shop Operations

    Deep

    drawing, stretching,

    Laser

    cutting, cladding,

    None

    (Drawing, spinning,

    Parameter / Operational Metric

    SKUs

    ANODISE D COOKERS

    (Aluminium

    ) Line

    Stainless Steel (SS) Line

    Tri-Ply Cooker Line

    trimming, forming, spinning, lipping, MHB

    holing, oval cutting

    dishing, and trimming

    and lipping handled externally

    ; optional in-house oval

    cutting)

    Critical In- House Cycle Times

    Pressing: 1014 s;

    Deep draw: 1012 s

    (Parkash Mechanical Press)

    Laser cutting: 30

    35 s;

    Cladding: 2530 s

    (Electrother m Press)

    Oval cutting: 7590 s

    (when processed in-house)

    Subcontract Surface Finishing Hops

    3 sequential hops (Buffing, Anodizing, Glossing)

    1 combined vendor (Chamfering

    , Buffing, and Sunray finishing)

    Multi- vendor network (Drawing/ Spinning/ Lipping, Buffing, Vendor

    Oval Cutting)

    External Transit Distances

    Local: 45

    km; Outer

    tier: 100

    200 km

    Regional cluster: 80

    275 km

    High dispersion

    : 80

    1,300 km

    (Palghar, Surat,

    Delhi)

    Longest External Dwell Time

    13 days per hop (cumulative 39 days)

    23 days cumulative dwell time

    23 days forming + 2 days vendor

    oval cutting

    Body-to-Body Joining Method

    Mechanical riveting (MHB / SHB)

    Electric projection welding (MHB /

    SHB)

    Electric projection welding (MHB /

    SHB)

    Gate-Exit Dispatch

    Documentatio n

    4 physical Delivery

    Challan copies

    4 physical Delivery

    Challan copies

    4 physical Delivery

    Challan copies

    Total Major

    Process Stages Mapped

    10 stages

    11 stages

    11 stages

    The diagnostic analysis of the value stream architectures of the main product lines of ABC Cookers Limited is provided in Table 1. It is clear that there are basic differences in operation determined by metal type and its forming process. While the line

    of ANODISED COOKERS Aluminium involves deep forming in house with fast machine cycles (10-14 sec), it involves cumulative multi-hop delays in three sequential stages of surface finishing (buffing, anodizing, glossing). On the other hand, the line of Stainless Steel utilizes in-house laser cutting and cladding and is faster due to consolidated finishing vendors. As for the Tri-Ply line, it utilizes the outsourced production process without in-house forming, which makes the plant suffer from heavy geographic dispersion involving 1,300 km distance and long dwell time of vendors. In spite of the difference in physical factors, all the three lines have similar operational bottlenecks at administrative interfaces characterized by four-copy physical Delivery Challan process in the course of subcontracting.

    Identify Value-Added and Non-Value-Added Activities and Classify Wastes (TIMWOODS)

    TABLE II.

    TIMWOODS Operational Waste Classification and

    TIMWOO

    DS Waste Category

    Wastes Classification

    Observed Shop- Floor Manifest ation

    Process Location

    / Product Lines

    Affected

    Value Additi on Status

    Business Impact & Operatio nal Severity

    Transporta

    Repeated

    Raw

    Non-

    Extended

    tion

    multi-hop

    Material

    Value-

    cumulativ

    vendor

    Stores,

    Added

    e

    transits up

    Subcontr

    (NVA)

    productio

    to 1,300

    act

    n lead

    km;

    Flow;

    times;

    manual

    All lines

    vulnerabil

    cart

    (Severe

    ity to in-

    transfers

    on Tri-

    transit

    between

    Ply)

    transit

    internal

    damages

    bays

    Inventory

    Buffer

    Job-

    Non-

    Elevated

    accumulat

    worker

    Value-

    working

    ion of 13

    locations

    Added

    capital

    days

    , Press

    (NVA)

    lock-in;

    dwell

    Shop

    poor

    time at

    staging;

    intermedi

    external

    ANODI

    ate

    job-

    SED

    material

    workers;

    COOKE

    visibility

    untracked

    RS, SS,

    and

    floor WIP

    Tri-Ply

    staging

    clutter

    Motion

    Non-

    Subcontr

    Non-

    Operator

    standardiz

    act bay,

    Value-

    physical

    ed travel

    Press-to-

    Added

    fatigue,

    (225 m)

    Assembl

    (NVA)

    ergonomi

    to

    y

    c strain,

    subcontra

    corridors

    and

    ct staging;

    ; All

    variable

    manual

    product

    transit

    trolley

    lines

    times

    movemen

    Shop-Floor Audit

    TIMWOO

    DS Waste Category

    Wastes Classification

    Observed Shop- Floor Manifest ation

    Process Location

    / Product

    Lines Affected

    Value Additi on Status

    Business Impact & Operatio nal Severity

    t across bays

    across shifts

    Waiting

    Forklift

    Gate

    Non-

    Truck

    dependen

    Entry,

    Value-

    idling,

    cy at

    Unloadi

    Added

    operation

    unloading

    ng Bay,

    (NVA)

    al idle

    ;

    Press

    time, and

    sequential

    Shop;

    delayed

    physical

    All

    line

    and visual

    pTroduct

    feeding

    checks

    lines

    during

    during

    shift

    gate

    handovers

    entry/exit

    Over-

    Generatio

    Dispatch

    /td>

    Non-

    Redundan

    processing

    n,

    , Gate

    Value-

    t clerical

    distributio

    Exit,

    Added

    labor,

    n, and

    Final

    (NVA)

    administr

    individual

    Packagin

    ative

    signing of

    g; All

    overhead,

    4 physical

    product

    and

    challan

    lines

    recurring

    copies;

    label

    duplicate

    waste

    QR

    printing

    Overprodu

    Regulated

    Central

    Necess

    Controlle

    ction

    under

    Press

    ary

    d risk of

    plant

    Shop,

    Non-

    obsolesce

    Make-to-

    Assembl

    Value-

    nce;

    Stock

    y Lines;

    Added

    batching

    (MTS)

    ANODI

    (NNV

    drives

    batch

    SED

    A)

    localized

    schedules

    COOKE

    lot

    (minimal

    RS, SS,

    staging

    uncoordin

    Tri-Ply

    buffers

    ated over-

    runs)

    This information is captured in Table 2 below, which illustrates the operational resistance within the product life cycle within the lean manufacturing concept of TIMWOODS. Through the analysis, it has been revealed that the production process within the factory faces tremendous operational challenges, mostly because of Transportation, Waiting, and Overprocessing. The transportation wastes tend to grow exponentially based on the geographical location of the supply chain and as a result, cause severe resistance on the Tri-Ply production line because of far job-work routes. Operation waiting resulting from single forklift and logistics coordination creates direct imbalance in the process. On the other hand, overprocessing waste is manifested in many ways including paperwork-based checks, like managing the four hardcopy delivery challans at gate exit an printing QR labels in packaging.

    Most importantly, value-adding activity only takes place during the processes of Press forming, Finishing and Assembling..

    Analyse Material Flow, Information Flow, Quality Inspection, and QR Traceability

    TABLE III.

    Direct Material / Component

    Vendor Wise Analysis

    Approved Vendor Base

    Inbound Movement Mechanis m

    Quality Checkpoint s & Inspection

    Standard

    Aluminium Circles

    Vendor A

    Vendor truck, Gate, Stores, Press

    Visual, dimensional

    , sheet thickness (IS 2500)

    Stainless Steel Circles

    Vendor B

    Vendor truck, Gate, Stores, Press

    Thickness, surface inclusions, dimensional

    check

    Lid Circles

    Vendor C

    Vendor truck, Gate, Stores, Press

    Sheet thickness, diameter, drawability

    inspection

    Main Handle (MHB)

    Vendor D

    Trolley transfer, Riveting / Welding

    Visual defect check, hole alignment,

    fitment

    Die Cast Component s

    Vendor E

    Inbound crates, Stores, Assembly

    Visual finish, flash presence, thread

    verification

    Stainless Steel Discs

    Vendor F

    Palletized delivery, Press Shop

    Thickness tolerance, surface finish,

    diameter

    Locking Loops

    Vendor G

    Boxed delivery, Assembly staging

    Dimensiona l check, tension check, profile

    check

    Rivets

    Vendor H

    Bagged inventory, Hardware Stores

    Material hardness, shank diameter,

    head profile

    Vent Tubes

    Vendor I

    Internal

    bins, Assembly /

    Thread

    pitch, bore clearance,

    Material Flow, Quality Governance, and QR Digital Traceability Audit- PART 1

    Direct Material / Component

    Vendor Wise Analysis

    Approved Vendor Base

    M

    Inbound Movement Mechanis m

    Quality Checkpoint s & Inspection

    Standard

    Sub- assembly

    finish inspection

    Cover Heads

    Vendor j

    Staged bins, Lid assembly line

    Visual inspection, thread integrity,

    plating check

    Rubber Gaskets

    Approved vendor tier

    Sealed boxes, Final assembly

    line

    Elasticity, dimensional profile, flash check

    Safety Valves

    Approved vendor tier

    Specialized trays, Final assembly

    Pressure relief pop- off calibration,

    threading

    Semi- Finished Cooker Bodies

    Internal Press & External Subcontractor s

    Trolleys / Return crates, Incoming QC

    13

    parameters (Profile, diameter, dents,

    cracks)

    TABLE IV.

    Material Flow, Quality Governance, and QR Digital Traceability Audit- PART 2

    Direct Material / Component

    Direct Material wise Traceability

    ERP Auto- Challan Integration

    QR Code Coverage for Purchase

    GRR

    Digitization & Traceability

    Status

    Aluminium Circles

    Fully Integrated

    Missing (No QR)

    Critical High- Volume

    Digitization Gap

    Stainless Steel Circles

    Fully Integrated

    Missing (No QR)

    Critical High- Volume Digitization

    Gap

    Lid Circles

    Fully Integrated

    Missing (No QR)

    High-Volume

    Raw Material Gap

    Main

    Handle (MHB)

    Fully Integrated

    Missing (No QR)

    Hardware

    Digitization Gap

    Die Cast Components

    Fully Integrated

    Missing (No QR)

    Hardware

    Digitization Gap

    Stainless Steel Discs

    Fully Integrated

    Missing (No QR)

    Forming Substrate

    Direct Material / Component

    Direct Material wise Traceability

    ERP Auto- Challan Integration

    QR Code Coverage for

    Purchase GRR

    Digitization &

    Traceability Status

    Digitization Gap

    Locking Loops

    Fully Integrated

    Missing (No QR)

    Fastener Hardware Gap

    Rivets

    Fully Integrated

    Partial (Modern only)

    Fragmented Vendor QR Adherence

    Vent Tubes

    Fully Integrated

    Partial (Recent lots missing)

    Inconsistent Supplier QR Compliance

    Cover Heads

    Fully Integrated

    Partial (Sadhguru

    only)

    Fragmented Vendor QR

    Adherence

    Rubber Gaskets

    Fully Integrated

    Fully Implemented

    Complete QR Traceability

    Closed-Loop

    Safety Valves

    Fully Integrated

    Fully Implemented

    Complete QR Traceability

    Closed-Loop

    Semi- Finished Cooker

    Bodies

    Challan tracked

    Missing on internal trolleys

    Paper-reliant inspection handoffs

    Table 3 and 4 highlights a comparison between movement of materials, frameworks for quality control, and digital traceability systems. While all vendors use ERP for challans but there is significant gap between QR traceability of the materials. Only around 40% components feature end-to-end QR traceability and implementation coverage. Surprisingly, the components such as lid and aluminium do not have traceability for QR codes . Quality inspection is random and does not follow any specific standards; however, execution remains predominantly paper-bound. Lack of tagging on the trolleys on shop-floor creates significant chaos and dependence on the person supervising it causing lack of traceability and identification of material after , before metal finishing, material in WIP and what needs to go for assembly.

    TABLE V.

    Multi-Criteria Process Bottleneck and Root-Cause Diagnostic Analysis PART-1

    Manufact uring Node / Process Stage

    Root Cause Analysis

    Primary Operational Bottleneck Root Cause (5-Why / Ishikawa Finding)Obs erved Delay /

    Metric

    Primary Operational Bottleneck Root Cause (5-Why / Ishikawa Finding)Obs erved Delay /

    Metric

    Primary Operational BottleneckR oot Cause (5-Why / Ishikawa

    Finding)Obs erved Delay / Metric

    Raw Material Receiving

    Prolonged truck dwell

    time and

    Single forklift dependency;

    4590 min vehicle waiting

    Manufact uring Node / Process Stage

    Root Cause Analysis

    Primary Operational Bottleneck Root Cause (5-Why / Ishikawa Finding)Obs

    erved Delay / Metric

    Primary Operational Bottleneck Root Cause (5-Why / Ishikawa Finding)Obs

    erved Delay / Metric

    Primary Operational BottleneckR oot Cause (5-Why / Ishikawa

    Finding)Obs

    erved Delay / Metric

    & Unloading

    receiving bay congestion

    absence of designated unloading berths; driver

    break overlap

    during peak hours

    In-House Press Shop Forming

    Line stagnation; staging clutter near trimming and laser cutting

    Suboptimal layout; lack of buffer management; untagged intermediate

    transport trolleys

    1530 min batch transit and staging latency

    First-Off Quality Approval

    Press lines idling awaiting setup buy-off

    Quality inspector unavailable on-floor; paper-based

    notification procedures

    2040 min setup idle time per tooling changeover

    Subcontra ct Dispatch & Staging

    Staging aisle congestion; dispatch delays at internal transfer

    Ambiguous physical loading areas (225 m

    variation); 4- copy hardcopy challan sign-

    offs

    3060 min gate departure latency

    External Vendor Processing

    Extended dwell times; multi-day processing queues

    Lack of visibility into external Mbuffer stock;

    geographic

    dispersion up to 1,300 km

    13 days dwell time per subcontract hop

    Incoming Subcontra ct Inspection

    Staged body backlog at receiving inspection bay

    Manual data entry into logbooks; irregular application of IS 2500

    sampling tables

    24 hours lot clearance queue time

    Final Packaging & Dispatch

    Exit

    Aisle blockages; carton deterioration;

    Space constraints; moisture- susceptible

    cardboard

    1020 min dispatch verification delay per

    shipment

    Root Cause Analysis

    Primary

    Primary

    Primary

    Manufact uring Node / Process Stage

    Operational Bottleneck Root Cause (5-Why / Ishikawa

    Finding)Obs

    Operational Bottleneck Root Cause (5-Why / Ishikawa

    Finding)Obs

    Operational BottleneckR oot Cause (5-Why / Ishikawa

    Finding)Obs

    erved Delay /

    erved Delay /

    erved Delay /

    Metric

    Metric

    Metric

    redundant

    cartons;

    labeling

    duplicated

    QR reprint

    cycles

    TABLE VI.

    Multi-Criteria Process Bottleneck and Root-Cause Diagnostic Analysis PART-2

    Manufacturing Node / Process Stage

    Root Cause Analysis

    Raw Material Receiving &

    Unloading

    Inbound transit scuffs, denting from manual

    offloading

    High Operational

    Bottleneck

    In-House Press Shop Forming

    Dominates scrap: 4

    5% line rejection (wrinkles, draw cracks)

    Critical Quality & Flow

    Bottleneck

    First-Off Quality Approval

    Line idling rather than defects; loss of

    productive machine hours

    High Availability Loss

    Subcontract

    Dispatch & Staging

    Handling scratches,

    corner denting during manual truck loading

    High Logistics Overhead

    External Vendor Processing

    12% vendor return rejection (buffing

    burns, uneven anodizing)

    Critical Lead Time Inflator

    Incoming

    Subcontract Inspection

    Risk of defective lots

    entering assembly undeteced

    High Quality

    Assurance Bottleneck

    Final Packaging & Dispatch Exit

    Carton compression damage; duplicate

    scanning errors at warehouse

    Medium Operational Overhead

    Table 5 & 6 identifies bottlenecks within the plant at operational, mechanical, and informational points. Operational data reveals that the main operational bottlenecks are due to material handing issues and administrative obstacles and not because of limits placed on the machines' primary cycle times. The raw material handling and internal transportation points have suffered immensely due to limited capacity for forklifts and poor planning in transit pathways, leading to vehicle idle times of as high as 90 minutes. In terms of quality, the Press Shop constitutes the main hub of defects, responsible for 4-5% of the cumulative rejection rate of 7-8% for the whole plant, due to metal deformation defects like wrinkles, breaking of metal when forming and tearing of metal edges. Subcontractor activities lead

    to major inflations in lead times, due to dwell times for materials of up to three days alongside paper-based incoming inspections.

    Recommend Feasible Lean and Digital Improvement Initiatives

    TABLE VII.

    Actionable Lean Interventions, Digital Architecture,

    and Projected Business Impact- I

    Targeted Operation al Bottleneck

    Actionable Lean Interventions, Digital Architecture, and Projected Business

    Impact

    Lean & TIMWOOD S

    Classificatio n

    Proposed Automatio n / Digital Solution

    Practical Implementati on Roadmap

    M

    4-copy hardcopy delivery challan sign-off

    Over- Processing

    Digital Invoice & E-Sign Workflow

    QR-coded digital challan, gate scan, mobile e-sign, ERP

    integration

    Machine idle time awaiting setup buy- off

    Waiting / Motion

    Digital First-Off Andon Alert System

    Operator triggers "Setup Ready", QC receives instant alert,

    tablet sign-off

    Unloading delays and vehicle congestion

    Waiting / Transportati on

    Digital Vehicle Queue & Dynamic Bay

    System

    Pre-arrival QR booking, automated token call, dedicated

    docking bay

    Recurring shop-floor aisle clutter

    Motion / Delay

    Digital 5S Mobile Audit Framework

    QR tags per zone, weekly mobile audits with photo

    verification, auto-scoring

    Single- operator dependency during breaks

    Waiting

    Digital Roster & Shift Relief Notificatio n

    ERP shift roster, automated notification of relief operators

    during breaks

    Single- forklift handling dependency

    Waiting / Transportati on

    Telematics Forklift Utilization Tracking

    IoT hour- meters and tracking to audit actual uptime before approving

    capital assets

    Unexpected forklift maintenanc

    Waiting / Equipment Loss

    QR-Based Preventive

    Maintenan ce (TPM)

    QR tag on assets,

    operator daily pre-shift

    Targeted Operation al Bottleneck

    Actionable Lean Interventions, Digital Architecture, and Projected Business

    Impact

    Lean & TIMWOOD S

    Classificatio n

    Proposed Automatio n / Digital Solution

    Practical Implementati on Roadmap

    Inability to track real- time cooker WIP

    Inventory / Tracking Waste

    Digital Multi- Stage WIP Milestone Scan

    Tablet milestone scanning at Press, Buffing, Anodizing,

    and Final Assembly

    Repeated duplicate QR label printing

    Over- Processing

    Duplicate Print Prevention Interlock

    Print-server validation preventing re- printing without

    supervisory override

    Inconsistent AQL

    sampling enforcemen t

    Defects / Quality Governance

    Digital IS 2500 AQL

    Quality Portal

    Mandatory digital check sheet logging 13 inspection points before

    ERP release

    Targeted Operation al Bottleneck

    Actionable Lean Interventions, Digital Architecture, and Projected Business

    Impact

    Lean & TIMWOOD S

    Classificatio n

    Proposed Automatio n / Digital Solution

    Practical Implementati on Roadmap

    e breakdowns

    mobile checks,

    predictive alerts

    Heavy manual exertion moving trolleys

    Motion / Transportati on

    Powered Electric Tug / Motorized Trolleys

    Deploy electric tugs on high- frequency transit routes

    (Press Shop, Assembly)

    Rework stock mixed with prime inventory

    Inventory / Defects

    QR-Coded Dynamic Rework Quarantine

    Red-tagged QR lots, software- locked ERP status, dedicated

    physical cage

    Untracked internal material carts

    Inventory / Motion

    Smart QR- Enabled Trolley Tracking

    Laser-etched QR tags per cart, milestone tracking (Bay, Subcontract,

    Line)

    Manual e-

    way bill generation overhead

    Over- Processing / Redundancy

    Automated ERP-to-E-

    Way Bill API Bridge

    Direct API bridge pushing ERP sales orders to the government e-

    way portal

    Disorganize d packing material staging

    Storage / Motion

    Visual Digital Packaging Supermark et

    Fixed barcode- racked locations, automated min/max replenishment

    alerts

    Carton moisture damage during transit

    Inventory / Quality Cost

    Returnable Smart Plastic Crates

    Heavy-duty foldable plastic totes with RFID/QR,

    vendor closed- loop return

    Aisle congestion near laser oval cutting

    Delay /

    Motion

    Designated FIFO

    Paint- Marked Lanes

    Color-coded floor bays and physical roller racks ensuring strict FIFO

    discipline

    The roadmap of comprehensive improvement in a low capital expenditure manner has been mapped out in Table 7 in context to the operational landscape of ABC Cookers Limited. The initiatives proposed have helped address directly the problem of 17 wastage areas in the shop floor through the implementation of the Lean work place design and selected applications of digital technology under the Industry 4.0 revolution. The major interventions in the form of setting up an ERP system linked with API for e-way bill creation and digital sign-off for delivery challans help eliminate over processing and reduce turnaround time at gates. In the shop floors, implementing an inspection notification via the Andon system and QR trolley tracker systems would directly help solve the waiting problem and hidden WIP respectively. Moreover, instituting a digital IS 2500 system would eliminate wastage from the 4-5% press shop and 1-2% vendors by making the parameter checking mandatory. The aggregate capital cost of which is not very significant.

  5. FINDINGS, CONCLUSIONS AND SUGGESSIONS

  1. Findings

    During the analysis of the empirical study at ABC Cookers Limited, it became clear that there were several operational discrepancies and lean waste generators for each of the ANODISED COOKERS Aluminium, Stainless Steel, and Tri- Ply manufacturing processes. First of all, it was found that through Value Stream Mapping, value generation occurs in only three key areas – press shop forming, subcontracted surface finishing, and assembly; however, the support processes add a lot of non-value added overhead. Secondly, it was discovered that the Tri-Ply stream suffers from an extremely vulnerable

    transportation waste because of the total dependence on distant geographically dispersed third-party forming vendors operating up to 1,300 km away with multiday dwell times, unlike other ANODISED COOKERS (1014 seconds) and Stainless Steel lines. Thirdly, in the case of all three manufacturing processes, the lack of efficiency caused by logistical issues is quite obvious, since the process of passing a challan takes place with the help of four separate copies and because of excessive waiting time (4590 minutes) caused by using a single forklift during unloading. Finally, the company's pressing process is the leading cause of rejections in the plant (7-8% cumulative rate), producing 4-5% scrap of fractured or wrinkled product. Moreover, it suffers from first-off inspection delays, as well as from the lack of IS 2500 Part 1 AQL sample enforcement. An analysis of the materials traceability showed that the plant experiences digitization problems. While high-risk safety hardware (gaskets, safety valves) has QR-code coverage of 100%, raw materials and intermediate product components (such as aluminium, stainless steel, and lid circles) have no Goods Receipt (GRR) process based on QR codes at all.

  2. Conclusions

    The comparative Value Stream Mapping study of ABC Cookers Limited reveals that despite individual high efficiencies of the forming/assembly process, the main factors restricting its efficiency relate to logistics hand-offs, administration lags, and traceability issues. As the analysis revealed, the main bottlenecks limiting production efficiency relate to structural wastes not directly associated with lack of machine capacity namely, excessive transportation efforts, time-consuming waiting related to forklifts operations, and laborious challan deliveries. There was a specific strategic contradiction revealed between various lines, as ANODISED COOKERS and Stainless Steel lines use efficient in-house press but have to go through multiple transportation loops during finishing operations. At the same time, the outsourced forming operation on the part of the Tri-Ply line results in significant lead-time associated with transportation efforts. At the same time, presence of significant amounts of defects (up to 4-5 % of scrap) in the press shop and lack of Goods Receipt with QR code for bulk metals require introducing effective quality governance mechanism. With systematic introduction of capital-efficient lean techniques, such as electronic first-off Andon, standard IS 2500 sampling, smart QR tracking of trolleys and integration of ERP billing system.

  3. Suggestions

    A roadmap for the success of the initiatives in achieving tangible benefits should consider the following key aspects for all stakeholders:

    Management and IT move away from paper four copies challenge process into an automatic digital signature ERP and e- Waybill process that will lead to minimizing administration cost and fast truck turnover time at the gate.

    Plant logistics and floor workers: Introduce a digital vehicle docking schedule in order to avoid single forklift waiting times and introduce electric tugs in the main transport corridors in order to reduce the effort, use of plastic weather resistant returnable trolleys to ensure FIFO lane.

    Quality assurance and operators: Introduce mobile-enabled andon and electronic inspection system (IS 2500).

    Suppliers and subcontractors: Expand the use of QR code traceability to bulk metal circles and intermediate trolleys and plastic weather resistant returnable trolleys in order to close loop of inventory control and minimize transit damage and smooth material handing.

  4. Implications of the study

    The findings of the research bring important and tangible implications and benefit for all key primary stakeholder groups:

    Executive management and shareholders minimizing the intermediate redundancy of work, reducing buffer inventory, and eliminating 7-8% of the scrap brings benefits of minimizing working capital, increasing productivity and saving operating margins.

    Shop-floor operators and shop-floor supervisors moving from manual transportation by trolleys to using motorized tugs as well as introducing visual 5S control systems increases ergonomics and minimizes physical stress in the workplace. Andon in real time gives ability to make tooling buy off and eliminates the friction of stopping the line.

    Quality assurance and compliance teams: Making IS 2500 AQL check sheet electronic and extending QR traceability to raw circles leads to uniform quality criteria for sampling, fast containment of defects and full traceability of batches.

    Suppliers, subcontractors, and transporters introducing automatic E-Way billing, digitization of challan, and appointment based dock will significantly reduce waiting times of vehicles at plant gate bringing benefits of quick payment, minimized.

  5. Future Scope of the study

The outcomes of this research and its base VSM results point to several possibilities for future work on the topic:

Dynamic Modeling: Future studies can implement a discrete event simulation (such as in AnyLogic/Arena) of machine balance, line balancing, and buffer sizes in response to fluctuating demand in advance of reconfiguring the actual physical floorplan.

Industry 4.0 & Automatic Traceability: Future research can look into the operational transition from QR code-based traceability to RFID or Internet-of-Things based smart sensors on the trolley system to enable automatic, touchless, real-time WIP tracking and cycle time monitoring at the machine level. Supply Chain Optimization: The logistics of the supply chain can be optimized in a dedicated TCO-oriented study to compare the cost implications of the current outsourcing of tri-ply pressing to the option of localizing vendor sites near the main factory site.

Green & Ergonomic Lean: Future studies implementing Sus- VSM (Sustainable Value Stream Mapping) can study the energy footprint of the process of forming, the risk indices (RULA/REBA) of manually moving the trolleys, and the life- cycle effects of plastic crate vs cardboard box substitution.

ACKNOWLEDGMENT

I express my sincere gratitude to the management, operations team, and shop-floor personnel of ABC Cookers Limited for their invaluable mentorship, technical guidance, and operational

support throughout this summer internship project. I am also deeply thankful to my academic advisors and industry mentors whose continuous encouragement made the successful completion of this research study possible.

Disclaimer: Name of the company is not mentioned due to the Non-Disclosure Agreement. Whereas, analysis done is on the true facts and figures.

REFERENCES

  1. Abdennadher, M., Sellami, A., Stockburger, E., Mohnfeld, N., Wester, H., Behrens, B.-A., Bouguecha, A., & Elleuch,

    R. (2024). Deep drawing of coated aluminium sheets: Experimental and numerical study. Materialwissenschaft und Werkstofftechnik. Advance online publication. https://www.semanticscholar.org/paper/c3d400a828a96cd 34e3cc19663a1295803949216

  2. Ahmad, A. (2011). Application of value stream mapping as a method to reduce cycle time to support lean manufacturing system [Unpublished manuscript]. Semantic Scholar.

    https://www.semanticscholar.org/paper/c8fffdfb41a24e4e bb6e898d8e5592707dcc23e5

  3. Arnando, F. (2015). Analisa waste dan peningkatan kualitas pada proses produksi pengolahan stainless steel dengan pendekatan lean manufacturing (Studi kasus: PT. X) [Unpublished undergraduate thesis]. Semantic Scholar. https://www.semanticscholar.org/paper/eb7493933e27d03 cc494ef9a10b0b336228845ea

  4. Damsiar. (2020). Waste analysis to increase productivity of metal press line in motorcycle discbrake industry using work study and lean manufacturing methods. International Journal of Mechanical and Production Engineering Research and Development, 10(3), 10471056. https://doi.org/10.24247/ijmperdjun20201047

  5. Dewa, M., & Lusiba, K. P. (2018). Continuous process improvement on heat exchanger plant through value stream mapping. In Proceedings of the International Conference on Industrial Engineering and Operations Management. https://www.semanticscholar.org/paper/c0e1e4c72ecee3e 0e44baeef4b25a2670873098d

  6. Dighe, S., & Kakirde, A. (2014). Lean manufacturing implementation using value stream mapping: A case study of pumps manufacturing company. International Journal of Science, Engineering and Technology Research, 3(6), 16811686.

    https://www.semanticscholar.org/paper/cab80532f0e88fc8 0af72eb152c3b1b492e1ea79

  7. Ealias, J., P. V., R., & Kiron, K. R. (2025). Factor impacting the quality of aluminium pot for developing customer language in FMQFD analysis. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 281290). IEOM Society International.

    https://ieomsociety.org/proceedings/india2025/281.pdf

  8. Infanteri, A. B. A. (2018). Implementasi lean manufacturing untuk mengurangi pemborosan (waste) pada proses produksi wajan super (Studi kasus di IKM WL Alumunium Umbulharjo, Yogyakarta) [Unpublished thesis]. Semantic Scholar. https://www.semanticscholar.org/paper/b1531c373e3cd76 b1d1e234061898891f91dd137

  9. Jaiswal, S., & Soni, M. (2017). A review on application of value stream mapping tool in small scale industry for waste reduction. International Journal of Engineering Sciences & Research Technology, 6(6), 332338. https://www.semanticscholar.org/paper/5b6ef6adf17ab33 6d98f567a2294af07917ab1cd

  10. Jawalkar, C. (2016). Improvement in product design through lean manufacturing and value stream mapping. International Journal of Management and Information Technology, 11(2), 27742782. https://www.semanticscholar.org/paper/2774d2aa0028400 4292aacae065321cfcea6bcfb

  11. Kaneku-Orbegozo, J., Martinez-Palomino, J., Sotelo- Raffo, F., & Ramos-Palomino, E. (2019). Applying lean manufacturing principles to reduce waste and improve process in a manufacturer: A research study in Peru. IOP Conference Series: Materials Science and Engineering, 689(1), Article 012020. https://doi.org/10.1088/1757- 899X/689/1/012020

  12. Karim, A., Jaafar, A., Abdullah, M. A., Haque, M., Ali, M., & Azline, S. A. (2012). Applying value stream mapping for productivity improvement of a metal stamping industry. Advanced Materials Research, 576, 727730. https://doi.org/10.4028/www.scientific.net/AMR.576.727

  13. Luan, T. D., Doanh, N. T., & Luc, B. Q. (2021). Effect of different tool on surface roughness for aluminium cookwares polishing. Journal of Mechanical Engineering Research and Developments, 44(4), 188194. https://www.semanticscholar.org/paper/108b5bb1643526 8c31c371b1be37ade389ff2395

  14. Management of non-value-added activities to minimize lead time using value stream mapping in the steel industry. (2020). Acta Montanistica Slovaca, 25(3), 328339. https://doi.org/10.46544/ams.v25i3.15

  15. Murugananthan, V., Govindaraj, K., & Sakthimurugan, D. (2014). Process planning through value stream mapping in foundry. International Journal of Innovative Research in Science, Engineering and Technology, 3(2), 92959302. https://www.semanticscholar.org/paper/f322e7da370e68c 9cee7f031c17f43b55166e602

  16. Nivya, M. (2016). Application of value stream mapping in a forging industry: A case study. International Journal of Mechanical Engineering and Technology, 7(4), 8591. https://www.semanticscholar.org/paper/a4dc29ddd8e1072 38c9c56c8fab45299b43e7fa4

  17. Ravichandran, V. (2015). Value stream mapping to improve value ratio of subcontracting process in a pressure vessel manufacturing facility: A case study. International Journal of Applied Research, 1(9), 415420. https://www.semanticscholar.org/paper/cff193e406ba615 d8d34790bde5442081c89542c

  18. S., D. (2025). A study of lean management implementation. International Journal of Scientific Research in Engineering and Management, 9(3), 19. https://ijsrem.com/download/a-study-of-lean- management-implementation/

  19. Salsabila, I. R., & Rochmoeljati, R. (2021). Analisis penerapan konsep lean manufacturing pada proses produksi stainless steel coil untuk mereduksi pemborosan (waste) di PT. XYZ. Juminten: Jurnal Manajemen Industri dan Logistik, 2(2), 117128. http://juminten.upnjatim.ac.id/index.php/juminten/article/ download/235/117