Mitigation of Power Swing in Wind Farm Distributed Generation During Balanced Three Phase to Ground Fault

DOI : 10.17577/IJERTV3IS10839

Download Full-Text PDF Cite this Publication

Text Only Version

Mitigation of Power Swing in Wind Farm Distributed Generation During Balanced Three Phase to Ground Fault

Kalpana Sinha1, Mr. Pawan C Tapre2

1 ME Student Power System Engg S.S.C.E.T. Bhilai (C.G.) India

2 Sr.Asso.Professor E.E.E. Deptt. S.S.C.E.T. Bhilai (C.G.) India

Abstract

This paper which concentrates mainly to mitigate the Power Swings in synchronous generator due to rotor speed oscillations in the wind farm due to balanced three phase to ground fault occur in the grid. In this paper PSS is used to damp out the rotor oscillation modes to maintain /stability. The analysis is done about the machine speed, load angle , active & reactive power during faulty condition with PSS. The proposed stabilizer is evaluated by simulation done through PSCAD software.

1.Introduction

A Power System Stability, which defines as that property of a power system, which enables it to remain in a state of operating equilibrium under normal operating conditions and to regain an acceptable state of equilibrium after being subjected to a disturbance [1, 2]. The importance of wind power generation which emphasis mainly on the improvement of the power system behaviour. A power system is defined as the set of inter linked generating plants, transmission lines and distribution systems, which are necessary for electricity systems. This paper focuses mainly on the generation power plants, primarily which are based on wind power generation. If wind power generation is capable of improving the power system stability, and more specifically to increase the damping of the system and control the power swing for better operating equilibrium under normal condition [3, 4,10]. The wind power does not induce new oscillatory modes itself because the generator concepts used in wind turbines does not create disturbance in power system oscillations. For example, synchronous generator connected directly to the grid has intrinsically more damped oscillation modes [4, 5].

A synchronous generator that is connected directly to the grid with PSS helps to enhance the stability of the system. The variable speed of wind turbines and faults in the system affects the rotor speed of synchronous generator. The loss of synchronism, which also may occur in the system because of these powers, swings which gets introduced in rotor speed, active and reactive power. To solve this problem PSS is used to provide the auxiliary damping to the rotor oscillations. On the other hand, the synchronous generator has a power system stabilizer to control power swing which controls the swing to deliver the desired active and reactive power to the grid. In this scheme, the control demands the wind turbine a variation in the power delivery. This power variation modifies the power flow of the whole power system in order to damp the desired oscillation modes [3, 6,10].

The aim of this paper is to propose a power swing control for wind turbines to damp the undesired power system oscillation modes when fault occurs from three phase to ground fault occurs. This paper is organized as follows. In section I, there is an introduction. In section II, an overview and description of distributed generation is presented. The whole concept of Power System Stability is defined in section III. Power System Stabilizer design is presented in section IV. A simulation model of power system in PSCAD with a wind farm is presented and discussed in section V. In section VI results and discussions of the graph is presented. At the end, In section VI, the conclusions are summarized.

2. Distributed Generation

Distributed generation (or DG) means small-scale (typically 1 kW 50 MW) electric power generators which generates electricity at site closer to an electric distribution system. A customer may choose to install a distributed generator based on various criteria. DG is used to generate a

customers overall electricity supply; for peak shaving (generating some part of a customers electricity onsite to minimize the amount of electricity purchased during peak price intervals); for standby or emergency generation; as an eco- friendly power source (making use of renewable technology); and for increased dependability. In some easily accessible locations, DG can be cheap as it cuts the requirement of cost of distribution or transmission lines [16,10].

Distributed Generation has a low investment because of its compactness (although the investment per unit output i.e. KVA, can be much greater than that of a bigger power plant). It also eliminates the requirement for bigger infrastructure construction because the DG can also be constructed at the desired primary location. If DG provides power for nearby use, it also decreases the pressure on distribution as well as on transmission. With few modern technologies, it produces nearly zero and zero pollutant emissions for entire period of its useful life (not taking into consideration pollutant emissions over the entire product lifecycle). With these technologies such as solar or wind, it is a type of renewable source of energy. It surely increases power source dependability for longer period of time or stand-by power requirement for customers and also provides customers a chance in their hand to decide for their own energy requirement [16,10].

3. Power System Stability

Power system stability is defined as the ability to remain in equilibrium during normal operating conditions and to regain an acceptable equilibrium after being subjected to a physical disturbance with most system variables bounded [4]. The stability responses of a power system can be classified as [2, 3, 7]:

  • Rotor angle stability, which concerns with the ability of each interconnected synchronous machine of the power system to maintain or restore the equilibrium between the electromagnetic torque and the mechanical torque.

  • Frequency stability, it is being related with the capability of a power system to restore the balance between the system generation and the load, with minimum loss of load.

  • Voltage stability, which is also dependent on the capability of a power system to hold on in steady state, the voltages of all buses in the system under

normal operating conditions and after a disturbance [8].

3.1 POWER SWING

Power Swing is caused due to the large disturbances in the power system which if not blocked could cause wrong operation of the distance relay and can generate false or undesired tripping of the transmission line circuit breaker. And if not prevented from the generator could cause severe damage to the machine [2, 7].

Whenever there is an unbalance between the torques acting on the rotor, the net torque causing acceleration (or deceleration) is

Ta = Tm -Te

Where,

Ta = accelerating torque in N-M Tm = mechanical torque in N-M

Te = electromagnetic torque in N-M

The combined effect of inertia of the generator and prime mover is accelerated by the unbalance in the applied torques. Hence the Swing Equation is

= Ta = Tm- Te

Where,

J = combined moment of inertia of generator and turbine, kg.m2

Wm = angular velocity of the rotor, mech.rad/s

T = time, seconds

4. Power System Stabilizer

The basic function of a power system stabilizer (PSS) is to add damping to the generator rotor oscillations by controlling its excitation using auxiliary stabilizing signals. To provide damping, the stabilizer must produces a component of electrical torque which is in phase with the rotor speed deviations. From the 1960s, PSSs are widely used to add dampingto electromechanical oscillations [9]. The PSS is also an additional control system, which is often applied as a part of an excitation control system. The PSS is being used to apply a signal to the excitation system,

producing electrical torques to the rotor in phase with speed differences that damp out power oscillations. They used to perform within the generator's excitation system to create a part of electrical torque, called damping torque which is, proportional to speed change. The PSS represents in fig 1 consists of three blocks such as a gain block, a signal washout block, and a phase compensation block which have two blocks for lead-lag compensation. The phase compensation block provides the appropriate phase-lead characteristics to compensate for the phase lag between the exciter input and the generator electrical torque. The signal washout block acts as a high-pass filter with the time constant that allow the signal which is associated with the oscillations in rotor speed to pass unchanged[2, 7, 8,10]. The commonly used structure of the PSS is shown in Fig. 1.

Fig 1: PSS Structure

    1. Balanced Three Phase to Ground Fault

      Faults may generally occur in a power system due to insulation failure, flashover, and physical damage or may be human error. These faults may be either three phase in nature involving all three phases in a symmetrical manner, or may be unsymmetrical where usually only one or the two phases may be involved. Faults may also be caused by either short-circuits to earth or between live conductors, or may be caused by broken conductors in one or more phases.

      Fig.3: Balanced Three Phase to Ground Fault

    2. PSS for Wind Turbine

      In order to design a power system stabilizer which will stabilise and control the purpose of rotor oscillations, it should be taken into consideration

      to the fact that wind power should not induce new oscillations to the existing power system. Also, if the wind farm is attached to the grid which is very far away from synchronous generators, it is impossible to attenuate the existing with the induced oscillations in the synchronous generators. So, it is important to have a complete knowledge about the power system and to decide which rank of inter-area modes can be rectified [9, 10].

      The proper design of the control scheme of variable speed wind turbines are based on the power system stabilizer technique as previously used. How so ever, the outputs can also vary. As it has been specified, the input may be any signals which are the result of the affect of the oscillations. This fact explains and directs the selection of the point of common coupling (PCC) as point for measurement, to avoid the filtering effect induced due to transformer which exists in between the grid and the wind farm. The output can be vary which is capable of varying the delivery of power as output to the grid [2, 3, 7,10].

      Fig 3: Block Diagram of wind farm distributed generation connected to the grid.

      5. PSCAD Simulation

      PSCAD/EMTDC is an integrated and very much capable of electromagnetic transients simulation purpose of program. It is an industries standard simulation tool. The user friendly graphical presentation of the software makes it extremely easy to make the circuits and to test and then to get the results which helps to manage the enormous data in a completely fully systematic and integrated graphical environment. PSCAD which also provides interesting creative, intuitive, interactive control inputs, meters, and also online plotting functions as well as graphs too. PSCAD is now been fully adopted worldwide by variety of utilities, number of manufacturers, research & educational institutions, and consultants as well to be primary and basic tool for transient simulation.

      Because of its graphical interface the time expenditure for the development of the program has dramatically been reduced [16, 10].

      PSCAD/EMTDC which uses sub-systems, which splits the entire job into numerous smaller units and makes the understanding very easy. In EMTDC the user can write and edit his program accordingly, which is best suited, within in a single integrated environment. Because of its presence of the artificial simulation and ease of integrated procedure to the main program, the PSCAD graphical user friendly interface it drastically increases the existing power and sustained usability as well as reliability of the simulation environment. It in addition also allows the user to construct a circuit schematic in a most effective and efficient manner, & run a simulation, to synthesise analyze and then finalize the results, and related graphs [16, 10].

      Fig 4: The Simulation Model of the Wind farm Distributed generation when Balanced Three phase to ground Fault

      Above fig shows the Simulation Model of the wind farm distributed generation which is connected to the grid in which the wind mill is directly connected to the wind turbine which is governed by the wind turbine governor. The wind turbine is directly connected to the synchronous generator which converts mechanical energy of turbine into electrical energy. The exciter is also connected to excite the system and also the PSS is connected with the exciter to provide required damping. The three phase line of synchronous generator is generally connected to 230V bus and it is stepped up to 400 KV through the use of step up transformer and as well as feeding to be 230V. The 400 KV supply is connected to the one of the bus of the two area system. There are two Thevenins equivalent loads which are connected to two 400KV bus bars which are separated by a distance of 412 km. The second line of 230V

      supply is connected to another Thevenins equivalent source. In this 230V supply line the block timed fault logic is connected, which is to create balanced three phase to ground fault in the line.

      6. Results & Discussions

      This paper shows the various results in wind farm with and without using PSS in PSCAD.

      1. During Normal Condition without using PSS

        W ind speed (m/s)

        1. Graph between wind speed (m/s) and time (sec.), when the wind speed is 14.0m/s and the wind farm DG system connected to the grid under normal condition.

          Main : Graphs

          Wind speed

          14.075

          14.050

          14.025

          14.000

          13.975

          13.950

          13.925

          13.900

          Time S 0.

          0

          5.0

          10.0

          15.0

          20.0

          25.0

          30.0

          Fig 5: wind speed during normal condition

        2. Graph between instantaneous Voltage (KV) and Time (sec.) where instantaneous three phase voltage is generated by wind generator without using PSS.

          Voltage(kV)

          Main : Graphs

          0.40

          0.30

          0.20

          0.10

          0.00

          -0.10

          -0.20

          -0.30

          -0.40

          Vins

          Time S

          00 1.025 1.050 1.075 1.100 1.125 1.150 1.175 1.200 1.225

          1.0

          Fig 6: Three phase instantaneous voltage during normal condition

        3. Fig shows the graph between grid voltage (KV) with time (sec) where instantaneous value of 400 KV, three phase grid voltage is applied and one cycle is completed with time duration of 0.02 sec.

          Main : Graphs

          400

          Three phase voltage

          5.0

          Main : Graphs

          Q w ithout PSS

          300

          200

          100

          0

          -100

          -200

          -300

          -400

          4.0

          G rid Voltage(kV)

          R eactive Pow er (MVar)

          3.0

          2.0

          1.0

          0.0

          0

          -1.0

          1.000 1.025 1.050 1.075 1.100 1.125 1.150 1.175 1.200 1.225

          Fig 7: Three phase grid voltage during normal condition

        4. Fig shows the Machine rotor speed (pu) and its Power swing when wind mill starts without PSS where the power swing is clearly observed after 2 sec.

        Main : Graphs

        Time S

        0.

        5.0

        10.0

        15.0

        20.0

        25.0

        30.0

        Fig.10: Reactive Power in MVar during normal condition

      2. During Normal Condition using PSS

1)Fig shows the Machine rotor speed (pu) and its reduction of Power swing when wind mill start with PSS where the power swing is clear after time period of 5sec.

w w ithout PSS

Main : Graphs

w w ith PSS

1.0080

1.0060

1.0040

1.0020

1.0000

0.9980

0.9960

0.9940

Time S 0.

0

5.0

10.0

15.0

20.0

25.0

30.0

1.0080

1.0060

Machine speed (pu)

1.0040

Machine speed (pu)

1.0020

1.0000

0.9980

0.9960

0.9940

Time S 0.0 5.0 10.0 15.0 20.0 25.0 30.0

Fig.8: Machine speed in per unit without PSS

  1. Fig. shows the generated active power and its Power swing when wind mill starts without PSS where the power swing is clearly observed after 2 sec and the maximum value of generated active power is 2MW.

    Pow er (MW )

    Main : Graphs

    Pow er w ithout PSS

    4.0

    3.0

    2.0

    1.0

    0.0

    Time 0.

    0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    5.0

    Fig.9: active Power in MW during normal condition

  2. Fig shows the generated reactive power and its Power swing when wind mill start without PSS Where the power swing is observed after 2 sec and the maximum value of generated active power is 0.9MVar.

Fig.11: Machine Speed in per unit with PSS in normal condition

Main : Graphs

Pow er w ith PSS

4.0

3.0

2.0

1.0

0.0

Time 0.

0

5.0

10.0

15.0

20.0

25.0

30.0

  1. Fig shows the generated active power and its reduction of Power swing when wind mill starts with PSS where the power swing is clear after time period of 4sec.

    Power (MW )

    5.0

    Fig.12: Active Power in MW with PSS in normal condition

  2. Fig. shows the generated reactive power and its reduction of Power swing when wind mill starts with PSS where the power swing is clear after time period of 4.0 sec.

Reactive Power (MVar)

Machine speed (pu)

Main : Graphs

Q w ith PSS

5.0

4.0

3.0

2.0

1.0

0.0

-1.0

Time S 0.

0

5.0

10.0

15.0

20.0

25.0

30.0

Main : Graphs

1.0200

1.0150

1.0100

1.0050

1.0000

0.9950

0.9900

0.9850

0.9800

w w ithout PSS

w w ith PSS

Time S

0.

5.0

10.0

15.0

20.0

25.0

30.0

0

Fig.13: Reactive Power in MVar with PSS in normal Condition

C.When Three Phase to Ground fault occurs at the system for particular time period without PSS

  1. Graph between instantaneous Voltage (KV)

    Fig.16: Machine Speed in per unit with PSS and without PSS

  2. Fig. shows the effect of PSS in the system for active power in the presence of fault. Where the PSS provide the additional damping to reduce the power swing.

5.0

and Time (sec.) where instantaneous three

Main : Graphs

P w ithout PSS P w ith PSS

phase voltage is generated by wind generator without using PSS when three phase to ground fault occurs for 0.05sec.

4.0

Pow er (MW )

3.0

0.40

T hree Phase Voltage (KV)

0.30

0.20

0.10

0.00

-0.10

Vins w ithout PSS

Main : Graphs

2.0

1.0

0.0

Time S 0.0 5.0 10.0 15.0 20.0 25.0 30.0

Fig.17: Active Power in MW with PSS and without PSS

-0.20

-0.30

-0.40

Time S 9.850 9.900 9.950 10.000 10.050 10.100 10.150 10.200 10.250

Fig 14: Instantaneous voltage in KV without Using PSS

  1. Graph between Current (KA) and Time when three phase to ground fault occurs at the line A. The fault was occurred after 10sec from the starting of the machine for the duration of 0.5sec.

  2. Graph between Reactive Power and Time and also comparison of two with PSS and without using PSS in the presence of fault.

Main : Graphs

Q w ithout PSS

Q w ith PSS

5.0

Reactive power (MVar)

4.0

3.0

2.0

1.0

Main : Graphs

0.0

Current

0

-1.0

Time S

0.

5.0

10.0

15.0

20.0

25.0

30.0

0.80

0.60

0.40

0.20

0.00

-0.20

-0.40

-0.60

-0.80

Current (kA)

Fig.18: Reactive Power in MVar with PSS and without PSS

Time S 9.9

40 9.960 9.980 10.000 10.020 10.040 10.060 10.080 10.100 10.120

Fig.15: Fault Current in KA when Threee phase to ground fault occur

D. When three phase to ground Fault occurs The Comparison of two with PSS and without PSS.

1) Fig shows the comparison of two cases in the system with PSS and without PSS for reduction of power swing in mechanical rotor speed in the presence of fault. After applying the PSS the Power swing is decreases.

  1. Graph between Load Angle (degree) and Time & also comparison of two with PSS and without using PSS in the presence of fault where the value of load angle is 23.606 degrees.

    Load Angle (degree)

    Main : Grap

    hs

    Load Angle del w ithout PSS

    Load Angle del w ith PSS

    70

    60

    50

    40

    30

    20

    10

    0

    Time S 0.

    0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    80

    Fig.19: Load Angle in degrees with & without using PSS

  2. Graph between Turbine Torque and time during balanced three phase to ground fault occur.

    Main : Grap

    hs

    Tturbine w ithout PSS

    Tturbine w ith PSS

    1.030

    1.020

    1.010

    1.000

    0.990

    Time S 0.

    0 5.0 10.0 15.0 20.0 25.0 30.0

    TABLE II

    1.040

    T urbine T orque (pu)

    Parameters of Wind Turbine

    Generator Rated MVA

    2 MVA

    Machine Rated mech. Speed

    16.6667

    Hz

    Rotor Radius

    40 m

    Air Density

    1.229

    Gear Box Efficiency

    0.97 pu

    Fig.20: Turbine Torque in Per unit with & without using PSS

    .

    7. Conclusion

    In this paper a brief explanation is oriented about power system stability for the wind powerin wind farm distributed generation in which power system stabilizer is designed to solve the problem of power swing during balanced three phase to ground fault condition and maintain the stability. PSSs are used to control the undesired active and reactive power injected into the grid by the wind farms and also control the rotor speed. To illustrate the application of PSSs in this area, a network consisted of synchronous generators and a wind farm with a PSS has been analyzed. The study of different cases show the ability of the wind farms, the PSS is used to increase the damping of inter-area oscillation modes to reduce the power swing and also the changes in power and speed under normal operation and under fault in the grid.

    TABLE I

    Armature Resistance (Ra)

    0.0025 pu

    Stator Leakage Reactance

    0.14 pu

    Field resistance (Rf)

    0.00043pu

    Field leakage Reactance

    0.2004 pu

    Unsaturated Reactance [Xd]

    0.920 pu

    Unsaturated reactance [Xq]

    0.510 pu

    Rated RMS line current

    2.89855 KA

    Base angular Frequency

    50 Hz

    Armature time constant[Ta]

    0.332 sec

    Parameters of Synchronous Generator

    8. References

    1. IEEE/CIGRE Join Task Force on Stability Terms and Definitions (2004). Definition and Classification of Power System Stability. IEEE Transactions on Power Systems, Vol 19, 2 pp. 13871388.

    2. Kundur, P. (2007). Power System Stability and Control. Ch 7 CRC Press.

    3. Jos´e Luis Dom´nguez-Garc´a, Oriol Gomis- Bellmunt, Fernando Bianchi, Andreas Sumper. Power System Stabilizer Control for Wind Power to enhance power system stability PHYSCON 2011, Le´on, Spain, September, 5September, 8 2011.

[4],G., Ekanayake, J. And Jenkins N. (2010). Power oscillation damping controller for fully rated converter wind turbines. Proceedings of International Universities Power Engineering Conference, Cardiff.

[6] Slootweg, J.G. and Kling, W.L. (2003). The impact of large scale wind power generation on power system oscillations Electric Power Systems Research, Vol 67 pp. 920.

[5]Miao, Z., Fan, L., Osborn, D. and Yuvarajan, S. (2009) Control of DFIG-Based Wind Generation to Improve Interarea Oscillation Damping IEEE Transaction on Energy Conversion, Vol 24 2, pp 415

42.

  1. Anderson, P.M. and Fouad, A.A (1977). Power System Control and Stability. Iowa State University Press.

  2. Kundur, P., Paserba, J. and Vitet, S. (2003). Overview on Definition and Classification of Power System Stability. Proceedings of Quality and Security.

  3. Mahdiyeh Eslami, Hussain Shareef, Azah Mohamed Power System Stabilizer Design Based on Optimization Techniques.

  4. Kalpana Sinha and Pawan C Tapre(2013) Distribution Generation in International Journal of Emerging Technology & Advanced Engineering (ISSN 2250-2459, ISO 9001:2008 Certified Journal), Volume

    3, Issue 10, October 2013.

  5. Larsen, E.V. and Swann, D.A. (1981). Applying Power System Stabilizers. Part I: Genearl Concepts. IEEE Transactions on Power Apparatus and Systems , Vol PAS-100, 6 pp. 30173024.

  6. Thakur, D. and Mithulananthan, N. (2009) Influence of Constant Speed Wind Turbine Generator on Power System Oscillation Electric Power Components and Systems , Vol 37, 5, pp. 478-494.

  7. Eping, Ch., Stenzel, J., P¨oller M. andM¨uller, H. (2005) Impact of Large Scale Wind Power on Power System Stability Fifth International Workshop on Large-Scale Integration of Wind Power and Transmission Networks for Offshore Wind Farms, Glasgow.

  8. Martinez, C., Joos G. and Ooi, B.T (2009) Power System sabilizers in Variable Speed Wind Farms Power & Energy Society General Meeting, Calgary..

  9. Hughes, F.M., Anaya-Lara, O., Jenkins, N. and Strbac G.(2006) A Power Sytem Stabilizer for DFIG- Based Wind Generation IEEE Transactions on Power Systems, Vol 21 2, pp 763772.

  10. Olimpo Anaya-Lara and E. Acha, Modeling and Analysis of Custom Power Systems by PSCAD/EMTDC, IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 17, NO. 1, JANUARY 2002, Pg. no. 266-272.

  11. Barker P.P.Power Technol. Inc, Schenectady, NY, USA Determining the impact of Distributed Generation on Power Systems. Radial Distribution Systems, Power Engineering Society Summer Meeting,2000, IEEE(Volume:3).

  12. Basler, M. and Schaefer, R. (2008). Understanding Power-System Stability. IEEE Transactions on Industry Application , Vol 44, 2 pp. 463474.

Kalpana Sinha has completed her

B.E. in Electrical Engineering from Bhilai Institute of Technology Durg [C.G.] in 2010 and presently pursuing her M.E in power system engineering from Shri Shankaracharya College of Engineering &

Technology Bhilai [C.G.].

Mr. Pawan C. Tapre presently working as Sr. Associate Professor in EEE department and ME Coordinator (Electrical) in Shri Shankaracharya Technical Campus, Bhilai. He has been completed his graduation in Electrical Engineering in 1995 and post graduation in Power System in 2002 from Shri Sant

Gajanan Maharag College Of Engineering and Technology, Shegaon (SSGMCE, Shegaon) Maharashtra. He has 8 year field experience and 11 year teaching experience.

Leave a Reply