✅
Premier International Publisher
Serving Researchers Since 2012

Development of Defect Performance Analysis and Dashboard to Automotive Inward Quality Inspection Supplier

DOI : 10.17577/IJERTCONV14IS120021
Download Full-Text PDF Cite this Publication

Text Only Version

Development of Defect Performance Analysis and Dashboard to Automotive Inward Quality Inspection Supplier

Prerna Pimpalshende

Student, MBA- Operations and Supply Chain Management, School of Business, Indira University, Pune, India 41103 prerna9881@gmail.com

Dr. Nitin Joshi

Associate Professor and Area Chair- MBA, School of Business,

Indira University, Pune, India 411033

nitinjoshi.sob@indirauniversity.edu.in

Dr. Hetal Bhinde

Associate Dean Ph.D. Programs, School of Business, Indira University, Pune, India-411033 hetalb19@gmail.com

ORCID: https://orcid.org/0000-0002- 6435-5113

Abstract – In this study, the inward quality inspection framework and supplier quality management system of Belrise Industries Ltd., Chakan are investigated in order to find out the operational bottlenecks and to reduce non-conformities in incoming parts by the company in the automotive industry. The study is based on the operational challenge of avoiding the inclusion of defective parts in assembly lines, which is rooted in Total Quality Management (TQM), Crosby's Zero Defects philosophy, the Pareto Principle, and the Acceptance Sampling theory (ISO 2859). The aim was to assess the current inward inspection system, review supplier defects, determine if certain defects are common across different suppliers and develop an interactive, data-driven decision support tool. Over a period of three months (13 April 13 July 2026), a combined descriptive and analytical research methodology was employed which included a scope of 17 suppliers, 137 part-number records and 246 inspected parts for the M110 and W610 vehicle platforms. The primary data collected from the field by observing the receiving workflows and inspection procedures was supplemented by company quality records and then processed, cleaned and analyzed in Microsoft Excel.

The empirical study showed that 13.01% (32 defects) were found overall. The most common inspection methods were standard sampling (69.85%), Direct Online status (18.38%) and 100% inspection (11.77%). A significant discovery was that a small number of critical vendors had a large percentage of defectsfive key vendors accounted for 84.38% (27 defects) of all non-conformities, with Vision Tools at the top with 21.88%. (18.75%), and V K Tools (18.75%). Tooling and dimensional control were identified as key failure modes by the Pareto analysis with the "Hole Under Size" (21.88%), "Manually Bend" (12.50%) and "100% Burr Present" (12.50%) representing almost half of the defect occurrences. Defects were similar across models (17 in M110 and 15 in W610), demonstrating that non-conformities are vendor process-focused and not platform-specific. The study concludes that the successful shift from a receiving inspection approach to a dynamic monitoring approach based on a supplier quality Excel dashboard is a critical part of Quality Assurance. Key practices recommended are supplier risk- based dynamic levels of inspection, supplier-specific Supplier Corrective Action Requests (SCAR) for tool maintenance and

integration of dashboard metrics into executive sourcing review meetings.

The keywords used for this article are Inward Quality Inspection, Automotive Supplier Quality Management, Pareto Analysis, Defect Classification, Acceptance Sampling, Quality Control Dashboard, Tooling Non-Conformities, Automotive Component Quality, Risk Based Inspection, Process Capability.

  1. INTRODUCTION:

    The automotive industry is an intricate and interdependent manufacturing environment where the quality of the final product is critically dependent on the reliability, accuracy and performance of materials and components supplied from outside the system. The automotive Original Equipment Manufacturers (OEMs) and Tier-1 suppliers depend on a wide multi-tier supplier base for raw material, engineered parts and sub-assemblies. In this kind of environment, it is critical to keep the incoming material quality constant in order to ensure continuous manufacturing without any interruptions in production, reduce scrap and rework expenses, and avoid the spread of defects to the subsequent manufacturing processes. Sometimes referred to as Incoming Quality Control (IQC), Inward Quality Inspection is the first operational filter to ensure that the part received meets the strict engineering specification before it starts being produced. This function includes part identification, dimensional layout checks, visual checks, material property checks, and standard documentation. In addition to non-conformance detection, IQC produces vital operational data that reflects the broader supplier capabilities. These inspection records can be analysed systematically to identify defect patterns for each supplier, part number, material grade and failure mode and turn the raw inspection data into actionable business intelligence for Supplier Quality Management (SQM).

    There is growing emphasis in academic literature, and in industry practice, that physical inspection as a stand-alone solution is not sufficient to deal with systemic problems in supplier quality. Using only detection is a barrier to operation, while using inspection data to inform proactive and preventive measures is an opportunity to improve overall supply chain performance. This study investigates the inward quality operations of Belrise Industries Ltd. in Chakan, Pune to tackle this shift in defect detection to supplier development through data. The project is conducted as part of a 3-month operational internship and assesses the day-to-day incoming inspection activities including gauge verification, Pre-Dispatch Inspection (PDI) reporting, Standard Operating Procedure (SOP) compliance, and Initial Article Inspection, and incorporates these inspections into a centralized Supplier Defect Performance Dashboard. The study uses statistical quality control tools, such as Pareto analysis, supplier defect distribution and inspection method categorizations to transform a collection of individual inspection logs into unified performance indicators.

    The last quarter is dedicated to literature review and theoretical background.

  2. LITERATURE REVIEW:

    Covaci, îu, and Dragomir-Pânzaru (2026) suggest that incoming-inspection data should be connected to a supplier process control and predictive governance through a Digital Quality Thread. The chapters 'A Study of the Quality Management Methods' and 'An Investigation on Supplier Delivery Performance' consider quality management practices in the automotive supply industry and the use of SPC in supplier monitoring. Ranking automotive suppliers using AHP is the subject of Suppliers Re-evaluation and reduced inspection for automotive suppliers is the topic of Developing a Skip-Lot Zero Defect Sampling Plan. Quality Control of Supplier Defects covers the analysis of defect categories, rejection trends, and 8D actions; Application of SPC for the Assessment of Supplier Performance covers rejection and process capability; and Beyond PPM explores the evaluation of supplier based on defect rate, risk and operational indicators. Optimizing Incoming Quality Control models inspection coverage and cost, and Sustainability of Zero Contamination Defects reviews automated optical inspection and DPPM. Statistical Monitoring of Supplier Performance discusses automotive quality-system monitoring, Incoming Inspection Improvement presents supplier evaluation, and Elimination of Incoming Inspection discusses suppliermanufacturer quality improvement. Sampling Plan for Incoming Material Inspection at Sanden is abot how to make the sampling plan reliable in automotive, Device and Method is about how to perform automatic part inspection and Perancangan Dashboard Digital Quality Assurance is about how to design a digital QA dashboard. These include Support Methodology, Dashboards, SPC-based Critical Parameters Monitoring, and Study of Practices all of which focus on aspects of visual and automotive quality reporting, as well as real-time vendor-part monitoring and a study of practices for logistics-dashboard adoption. Lastly, dashboard, defect, SPC, Pareto, and root-

    cause approaches are provided by A Visually-Oriented Quality Improvement Data Management System, Analysis of Selected Problems, Application of SPC in Automotive Manufacturing, Quality Defects Analysis for Automotive Trim Parts, and Leveraging Digital Dashboards.

    A. Theoretical Background:

    Inward quality inspection and supplier quality management are based on the theoretical basis of the Total Quality Management (TQM) and Statistical Process Control (SPC). In contemporary automotive supply chain, inward quality control acts as the first line of defense to make sure that non-conforming parts do not enter into production lines, which is also in line with the concept of "Zero Defects" introduced by Philip Crosby. For Crosby, Quality is Conformance to Requirements, and in removing defects at the Receiving stage the Exponential Cost of Poor Quality from Downstream Line Stoppages, Rework and Warranty Claims are reduced. In parallel, Joseph Juran's Pareto Principle, the "80/20 rule", is an analytical tool used to assign non-conformances to a small number of "vital few" defect types and suppliers. In addition, Acceptance Sampling theory (as found in ISO 2859 / MIL-STD-105E standards) dictates the decisions for risk-based incoming inspections, weighing producer risk versus consumer risk in determining sampling plans versus 100% inspection or Direct Online (DOL) status. Continuous feedback loops are also necessary from the Plan- Do-Check-Act (PDCA) cycle advocated by W. Edwards Deming, which converts inward inspection data into actionable metrics, which are then used to conduct root cause analysis, supplier corrective action requests (SCAR), and continuous process improvement. Combined with state-of-the-art digital visualization tools, these theoretical models can help organizations move from being reactive in detecting defects to proactive in managing supplier performance based on data.

  3. MATERIALS AND METHODS

    A. Research Objectives

    The study is of mixed type (descriptive and analytical) in order to assess the inward Quality inspection system of the Belrise Industries Ltd. Chakan. The study was carried out within a period of 3 months from 13 April 2026 to 13 July 2026. The target population included all incoming automotive components at the plant, specifically the M110 and W610 vehicles. A purposive sampling technique, a non-probability sampling technique, was used to select a defined scope of 17 suppliers, 246 parts supplied/inspected, 137 part-number records and 32 defects recorded.

    Both primary and secondary data sources were used in the investigation. Primary data were collected by direct observation of receiving workflow, inspecting routines, quality checkpoints, and the use of measuring instruments on different levels of complexity of the components. Secondary data were obtained from company's quality records, inspection checklists, Standard Operating Procedures (SOPs), process control plans and pre dispatch inspection reports.

    Data collected were cleaned, structured, and standardized in an Excel master data set to eliminate inconsistencies and duplicates. Quantitative data analysis was conducted to categorize the defects and group them by supplier, Pareto analysis was performed to identify critical non-conformities

    1.

    Vision Tools

    7

    21.88

    %

    High Volum e

    Primary defect contribut or; requires process audit

    2.

    NextG en Engg.

    6

    18.75

    %

    Mediu m Volum e

    High defect concentr

    ation relative to supply volume

    3.

    V K

    Tools

    6

    18.75

    %

    Mediu m Volum e

    Frequent dimensio nal non- conformit ies

    4.

    Belrise Ranjan gaon

    4

    12.50

    %

    High Volum e

    Internal inter- plant supply issues

    5.

    NexGe n

    4

    12.50

    %

    Mediu m Volum e

    Forming and burr- related non- conformit ies

    6.

    Remain ing 12 Supplie rs

    5

    15.62

    %

    Varies

    Minor/in frequent defect occurren

    ces

    Total

    17

    Supplie rs

    32

    100.0

    0%

    246

    Overall Defect Rate: 13.01%

    (causing the most issues), like undersized holes, manual bending and burrs. In the end, information was combined into an interactive KPI-driven dashboard in Excel, which enabled visualization of supplier performance, distribution of inspections and trends of their defects.

  4. DATA ANALYSIS AND DISCUSSION

    The distribution of the Operational Baseline and Inward Inspection Methodology is shown in Table 1

    Table 1: Operational Baseline and Inward Inspection Methodology Distribution

    Parameter

    Scope /

    Recor d Count ()

    Operation

    Operationa

    Sub-

    Distributio

    al

    l Metric

    Categor

    n (%)

    Checkpoint

    y

    s & Focus

    High

    feature

    M110

    69

    50.36%

    density,

    complex

    Model

    length/hole

    Distributio

    checks

    n

    Critical

    49.64%

    forming,

    W610

    68

    slots, and

    bending

    verification

    Table 1 data shows that sampling inspection is the main type of inspection for incoming inspection, with 69.85%, followed by 18.38% Direct Online and 11.77% 100% inspection depending on component criticality. A total of 137 part-number records and 246 inspected units have a defect rate of 13.01% (32 defects). M110 (50.36%) and W610 (49.64%) are spread evenly, with each one requiring different verification protocols because of the feature density, including hole diameters, slot positions and length dimensions. The direct impact of material grade diversity (MM21D, MM24 HSLA340, MS, STD and PLASTIC)

    on tool wear, gauge selection and inspection intensity are the primary facors to consider. Although the sampling method has provided an optimum throughput for routine parts, the 13.01% defect rate indicates a need to adapt the intensity of the inspection based on the supplier's capabilities and material characteristics.

    The supplier quality performance and defect contribution analysis are shown in Table 2.

    Rank

    Supplie r Name

    Total Defe cts

    Shar e of Total Defe cts(N

    =32)

    Parts Inspec

    ted

    Defect Concentr ation / Performa nce Profile

    Table 2: Supplier Quality Performance and Defect Contribution Analysis

    The performance of suppliers is significantly different between the 17 suppliers assessed in the scope of the project. Incoming defects are mostly concentrated with five suppliers, accounting for 84.38% (27 out of 32) of all defects recorded. NextGen Engg. and V K Tools are the next highest single contributors with 6 defects each (18.75%) and Belrise Ranjangaon and NexGen with 4 defects each (12.50%). 15.62% of the defects came from the remaining 12 suppliers (4). When coupled with volume of supplies, the evaluation of defect volume will help to avoid the misjudgment of high volume suppliers. However, the high concentration of non-conformities from the top 5 vendors shows that targeted supplier audits, tool inspections and supplier development efforts targeted on these identified sources will provide immediate quality improvements.

    Table 3: Defect Frequency, Pareto Classification, and

    Model Breakdown

    Defect

    Descri ption /

    Cou nt

    Indiv

    idual Shar

    Cumula

    tive

    Asso

    ciated Mode

    Root

    Cause Area /

    Catego

    e

    Share

    l

    Quality

    ry

    (%)

    (%)

    (M11

    Impact

    0 /

    W61

    0)

    Hole Under

    Size

    7

    21.8

    8%

    21.88%

    M110

    / W610

    Punch wear,

    incorrect

    pin size,

    poor tool

    maintena

    nce

    Manua

    4

    12.50

    34.38%

    W610

    Secondar

    lly

    %

    y manual

    Bend

    operation

    , bending

    gauge

    variation

    100%

    4

    12.5

    46.88%

    M110

    Dull

    Burr

    0%

    /

    piercing/t

    Presen

    W610

    rimming

    t

    dies,

    improper

    clearance

    Slot-

    3

    9.38

    56.26%

    M110

    Tooling

    Relate

    %

    misalign

    d

    ment,

    Issues

    positionin

    g error

    Forma

    3

    9.38

    65.64%

    W610

    Press

    tion /

    %

    tonnage

    Profile

    variation,

    Defect

    material

    springbac

    k

    Dimen

    3

    9.38

    75.02%

    M110

    Raw

    sional

    %

    /

    material

    Out-

    W61

    thickness

    of-

    0

    variation

    Spec

    , gauge

    miscalibr

    ation

    Other

    8

    24.98

    100.00%

    M110

    Miscella

    Non-

    %

    (17) /

    neous

    Confor

    W61

    surface

    mities

    0 (15)

    and

    visual

    defects

    Total

    32

    100.0

    –

    **M1

    W610:

    Recor

    0%

    10:

    15**

    ded

    17

    Defect

    s

    Pareto analysis shows that there are a few major defects that cause quality non-conformities. The biggest defect category is

    "Hole Under Size", with a total of 7 (21.88%) defects. There are 4 occurrences of "Manually Bend" (12.50%) and 4 occurrences of "100% Burr Present" (12.50%). The three most common defect categories make up almost half (46.88%) of all defects observed. Model-wise distribution reveals that 17 defects are found in the M110 whereas there are 15 defects in the W610, indicating a balanced distribution of defects, meaning that the defects are not due to the specific design of the vehicle models but because of the manufacturing processes of their respective suppliers. The amount of hole undersizing and overburring is a direct indicator of tool wear and improper punch clearances along with insufficient vendor end gauge maintenance; these are definite areas of focus for corrective action.

  5. FINDINGS, CONCLUSIONS AND SUGGESTIONS

A. Findings

This study has been carried out on the inward quality inspection system of Belrise Industries Ltd, Chakan on M110 and W610 models of vehicle by analysing 137 records of part number from 17 suppliers and 246 parts inspected while the overall inward defect rate is 13.01% (32 defect recorded). The results from the evaluation of sampling inspection methodologies identified that standard sampling inspection was the dominant methodology when it came to receiving control, 69.85% (95 records), followed by 100% inspection, 18.38% (25 records) and Direct Online (DOL) inspection at 11.77% (16 records). Supplier-wise Non-Conforming Items analysis found that a small number of suppliers had a high percentage of non-conforming items, with five suppliers accounting for 84.38% (27 Non Conforming Items) of all non-conforming items, namely Vision Tools (7 Non-Conforming Items, 21.88%), NextGen Engg. (6 Non- Conforming Items, 18.75%), V K Tools (6 Non-Conforming Items, 18.75%), Belrise Ranjangaon (4 Non-Conforming Items, 12.50%) and NexGen (4 Non-Conforming Items, 12.50%). The Pareto analysis of the non-conformances showed that dimensional and tooling-related errors were the most common causes of non-conformance, accounting for almost 50% of the total (46.88%), with "Hole Under Size" as the most frequent error type at 7 occurrences (21.88%). The defects were distributed fairly evenly between the vehicle platforms (17 in M110, 15 in W610), indicating that the platform design is not the primary cause of quality risks, but rather, is a result of manufacturing from the vendors and tool wear. Finally, a Supplier Quality & Inward Inspection Dashboard (SQID), an interactive Excel model, was developed to successfully combine all these metrics into one dynamic inspection management tool for risk-based inspection planning and targeted supplier corrective actions.

B. Conclusions

The study's results show that the incoming quality inspection system is an important preventive measure against compliance of the components supplied to Belrise Industries Ltd., Chakan, but it must move from a static inspection to a dynamic process with data driven supplier management. The overall incoming defect rate determined by analysis of receiving records was 13.01% of 246 parts examined, with most of the defects concentrated from a small number of vendors. In particular, five suppliers produce 84.38% of the total defects recorded with Vision Tools, NextGen Engg. and V K Tools being the leading

causes. Moreover, Pareto analysis shows that the main physical quality problems are not specific to any vehicle platform (such as the M110 or W610) but are mostly manufacturing and tooling related, and that the leading problems are undersized holes, manual bending deviations and too large burrs. Standard sampling inspection (69.85%) lack real-time supplier risk integration to prevent defects proactively. In the end, the interactive Excel-based Supplier Quality & Inward Inspection Dashboard provides the management with an analytical tool that enables them to enforce the correct inspection frequency based on risk assessment and to start targeted Supplier Corrective Action Requests (SCAR), avoid punch tool degradation at vendor sites, and improve incoming material quality continuously throughout the automotive supply chain.

C. Suggestions

The results give the following practical recommendations for key stakeholders to enhance inward quality and supplier performance:

For Belrise Quality & Production Teams: Establish an automatic inspection mechanism that raises high defect suppliers (such as suppliers Vision Tools, NextGen Engg.) from the normal inspection to temporary 100% inspection, and gives Direct Online (DOL) status to high-quality suppliers who always adhere to the quality standards to optimize inspection efficiency on the shop floor.

To External Suppliers & Vendor Development: Send targeted Supplier Corrective Action Requests (SCAR) for high frequency tooling problems, such as holes that are undersized and burrs are too large. Require preventive maintenance for piercing dies/punches and pre-dispatch gauge verification of dies/punches at vendor facilities before shipment.

Implement a Supplier Quality Dashboard in weeks review meetings and integrate the excel sheet into weekly review meetings to monitor the suppliers KPIs, to link the supplier quality rating with the purchase allocation in the coming weeks and to create joint quality improvement workshops with persistent low performing suppliers

D. Implications of the study:

D. Significant findings from this research for main stakeholders of the organization are:

Inward Quality Inspectors & Operational Teams: Offers a framework of structured, risk-based approach to move inspectors away from uniform sampling and towards dynamic checking, with the labour & gauge resources deployed where there is the greatest likelihood of a defect.

Suppliers & Component Manufacturers: Both establishes performance accountability and makes it transparent. Vendors have a clear view of their defects trends and are able to invest appropriately in preventing defects from tool maintenance issues (e.g., holes that are too small because of tool wear) and pre-dispatch quality control.

Plant Management & Executive Leadership: Provides a centralized real-time decision making dashboard for plant leadership, empowering them to allocate plant sourcing decisions with data, conduct objective supplier evaluations and minimize rework and line stoppage costs in the assembly line.

Vehicle Design & Assembly Stakeholders: Offers evidence that component quality issues brought in are not

platform specific, thus allowing engineering teams to keep standardizing parts across multiple models without having to redesign parts for M110 and W610 lines.

E. Future Scope of the study

Further research needed

The scope of this study does not limit itself to the aforementioned but extends to several other aspects of improvement of the inward quality management process:

ERP & IoT Integration: Converting the old, off-line Supplier Quality Dashboard, which was dependent on stand- alone Excel, to a real-time module in the ERP/SAP system, that automatically logs defects, scores vendors in real-time & immediately blocks non-conforming batches.

Advanced Analytics & AI-Driven Inspection: Leveraging predictive analytics and machine learning algorithms for anticipating vendor defect risks, informed by past quality trends, material grade characteristics, and production batch sizes.

Automated & Computer Vision Systems: How to use Automated Optical Inspection (AOI) and vision-based measurement systems to inspect high-volume parts and eliminate visual & dimensional defects in a repeatable manner, such as burrs, hole undersize, or slot misalignments.

Supply Chain Expansion: Adding additional vehicle models to the M110 and W610, tier-2 sub-suppliers to be managed, and additional incoming inspection workflows for raw materials.

ACKNOWLEDGMENT:

I would like to thank the manaement, faculty and project guide and operational team who provided me with great guidance, encouragement and technical assistance to complete this project study successfully.

REFERENCES:

  1. Bala, D., Batson, R., Moynihan, G., & Ray, P. (2004). A system for managing data for quality improvement that is designed to be used visually. International Journal of Automotive Technology and Management.

  2. Cepeda, T. A., & Lopes, I. S. (2020). Methodology for supporting product quality assurance in a company in the automotive sector.

  3. Covaci, C.-A., îu, A., & Dragomir-Pânzaru, C. (2026). The digital thread for quality: Bringing in inspection data to supplier process control for zero-defect supply chains. Annals of the Academy of Romanian Scientists Series on Economy, Law and Sociology.

  4. Covaci, C.-A., îu, A., Chivu, O., & Nitoi, D. (2026). Beyond PPM: Multi-dimensional system for evaluating the performance of suppliers for quality in automotive electronics. The Annals of the Academy of Romanian Scientists present a new series on Economy, Law and Sociology.

  5. Crossfield, R., Dale, B. (2014). Developing a skip-lot zero defect sampling plan: What are the main issues? International Journal of Vehicle Design.

  6. Darestani, S. A. (2010). Statistic survey of supplier performance in quality management system in the automotive industry in Iran [Doctoral dissertation].

  7. Darestani, S. A., Ismail, M. Y. B., Ismail, N., & Yusuff, R. (2010). An investigation on supplier delivery performance by using SPC techniques for automotive industry.

  8. Dumitrascu, D., Rusu, A.-N., & Dumitrascu, A. (2024). Manufacturing process Quality defect analysis of automotive trim parts. Engineering Proceedings, 76(1), Article 32.

    https://doi.org/10.3390/engproc2024076032

  9. Fleac, C., Bujdoiu, R.-M., & Severin, I. (2025). Improvement of logistic processes with the application of quality tools in the automotive industry. Cognitive Sustainability.

  10. Hidayat, B and Mulyono, S. (2025). Planning quality assurance of dashboard digital for efficiency control of the production process in PT. Dharma Polimetal, TBK. The Venus, 1051, 1268.

  11. Lascelles, D. and Dale, B. (1988). An investigation of the quality management techniques used by U.K. automotive suppliers. Quality and Reliability Engineering International.

  12. Mizuno, R. K. (2018). Dashboards para análise de dados no segmento automotivo.

  13. Puntel, L. (1995). Sampling plan for incoming material inspection at Sanden.

  14. Reiss, E., Hicks, G., & Chou, P. (1984). A program for improving the quality of the product being supplied from a manufacturer/supplier that eliminates the need for incoming inspection.

  15. Rohani, J. M., Yusof, S., & Mohamad, I. (2009). Success factors and performance in SPC.

  16. Sahoo, P., Garg, I., Rawat, S., Narula, R., Gupta, A., Bindra, R., Rao, A.

    V. N., & Garg, V. (2025). The quality control of vendor supplied parts for monitoring critical parameters using SPC is discussed by the auto OEM (SAE Technical Paper No. 2025-01-XXXX). SAE International.

  17. Thambirajah, J. J. (2023). Use of statistical process control in assessing supplier performance and process capability at an automotive manufacturing company. Current Trends in Engineering Science, 3(2) https://doi.org/10.54026/ctes/1043

  18. Yahyaoui, S., & Zaim, M. (2025). AHP approach and performance criteria in automotive industry for tomorrow's smart supply chain. Acta Logistica,

    12(1). https://doi.org/10.22306/al.v12i1.611

  19. Yasarudin, Y. (2014). Incoming quality inspection: sustainability of zero contamination defects (Master's thesis, Universiti Teknikal Malaysia Melaka).

  20. Yun, H., & Barde, S. (2025). Using digital dashboards to improve automotive reliability: Case study noise and vibration reduction in front- wheel driveshaft joints. Proceedings of the Institution of Mechanical Engineers Part O: Journal of Risk and Reliability.

  21. Zhou, W., Chen, Y., Zhou, R., & Sharaf, M. (2026). Optimization of incoming quality control based on dynamic set covering strategy for zero- defect inspection. IEEE Access. https://doi.org/10.1109/ACCESS.2026.3686425