DOI : 10.17577/IJERTV15IS031707
- Open Access
- Authors : Dhrub Kumar Singh, Bapan Parya
- Paper ID : IJERTV15IS031707
- Volume & Issue : Volume 15, Issue 03 , March – 2026
- Published (First Online): 06-04-2026
- ISSN (Online) : 2278-0181
- Publisher Name : IJERT
- License:
This work is licensed under a Creative Commons Attribution 4.0 International License
Deterministic Inventory Model with Price- Dependent Demand and Allowable Delays in Payments in the Context of Learning Effects for Object Degradation
Bapan Parya
Research Scholar, Department of Mathematics,
YBN University, Namkum, Ranchi, Jharkhand, Pin:-834010
Dhrub Kumar Singh
HOD, Department of Mathematics,
YBN University, Namkum, Ranchi, Jharkhand, Pin:-834010
Abstract – This study develops a comprehensive inventory model addressing the joint effects of price-dependent demand, product degradation, allowable payment delays, and learning curve impacts. Utilizing differential equations and boundary conditions, the methodology derives optimal replenishment policies and cycle times to minimize total costs, including holding, deterioration, shortage, and interest-related expenses. Numerical examples demonstrate that incorporating degradation and credit policies significantly reduces inventory costs and enhances supply chain efficiency. Sensitivity analyses reveal that parameters such as delay period, deterioration rate, and shipment frequency critically influence optimal strategies. The findings provide valuable insights for retailers and suppliers to optimize inventory management under realistic conditions involving product perishability, demand fluctuations, and credit terms. Overall, the model offers a practical framework for improving decision-making in inventory control, contributing to more resilient and cost-effective supply chain operations.
Key Word : Inventory management; Stock-dependent demand; Price-sensitive demand; Trade credit; Deteriorating items; Imperfect production; Weibull distribution; Integrated inventory model; Supply chain optimization
-
INTRODUCTION
Efficient and effective inventory management is of paramount importance to all organizations to ensure maximum profits. This focuses on optimal research into inventory management. In particular, Inventory research has increased significantly over the past 20 years. Several researchers have sought to develop supply chain management with a realistic approach and industrial applications, taking into account various Parameter and assumptions. Recently, commercial balances have proven to be an effective tool to increase organizational sales and profits. Therefore, providers are directly motivated to allow customers to pay their customers at certain times without penalties for improving the product. Even if an acceptable delay in payment reduces the cost of holding inventory. It actually eases short-term funds. Especially for small, capital-only companies. Additionally, retailers may collect additional revenue during the allowable delay period, as they invested in either a bank or a market investment. Thus, acceptable delays provide a delicious alternative for small finances to stimulate new demand for the product, additional customer issues. Retailers may result in additional charges for unpaid fees if the customer does not pay at a certain time. Recently, degradation effects actual importance affect practical inventory opportunities. Deterioration is related to the collapse of the durability of the product, disappointing the original quality of the product before final consumption. Researchers address different types of degradation and demand patterns to find the best solution. Here, the proposed model considers certain degradation effects via inventory. A combination of stimulates retailers' additional revenues by this hinders the concept of acceptable late payments.
Demand rate is a function that allows you to always differentiate time. If the customer is satisfied with the price and quality of the perishable object, the requirement remains constant in the second phase, known as the "Ramp" request, as the request reacts as a function of time incrementally. This demand is easily observed during festive seasons like Christmas, Dussehra, Diwali etc. This demand rose in early October and sales will rise linearly as they constantly reach December.
The more realistic situations exist in the market, lamp demand deserves comprehensive research. Observe that corrosive objects are wasted during storage due to physical deposition. This waste attracts customer inflation and retailer losses. This can be avoided if you have determined the optimal drawing cycle time for your inventory. Therefore, the proposed study can observe degradation effects through inventory. As a result, retailers can minimize the associated costs per hour. At the same time, suppliers retailers can absorb order behavior through proposed research. We create Mathematical Models the optimal inventory strategy through and use two advantages: allowable delays in payments and junctions of ideas compared to inventory. The basic mathematical models are introduced at the start and then presented in numerical examples. Therefore, the proposed research through effective inventory management has benefited greatly from retailers.
-
LITERATURE REVIEW
In today's competitive business transactions, it is common for suppliers to offer specific fixed loans to retailers to stimulate demand. During this loan, retailers can collect income and earn interest on this sale. However, the supplier calculates interest in outstanding balances beyond this period. Therefore, acceptable delays reduce the cost of holding shares indirectly. Meanwhile, retail credits offered by suppliers encourage retailers to purchase more. Therefore, it is also a powerful advertising tool to attract new customers who view it as an alternative incentive guideline for quantitative discounts. Therefore, commercial credit can play an important role in inventory management for both suppliers and retailers (see Jaggi, Goyal & Goel, 2008) [1].
Hill (1995)[2] proposed an inventory model in which variable branches are in all performance functions. Research in this field continues in Mandal and Pal (1998), Wu and Ouyang (2000), and Wu (2001). In the above task, the optimal replenishment guidelines require a decision time to reach zero inventories. Deng, Lin and Chu (2007) [7] first covered the stock model proposed by Mandal and Pal (1998) [3] and Wu and Ouyang (2000)[4], both of which occurred.
Panda, Saha and Basu (2007)[5] constructed an inventory model for degradation of objects (with three parameters and registered degradation rates) with generalized exponential ramp question quotas and full feedback. Skouri, Constantaras, Papachristos and Ganas (2009)[6] and Deng et al. (2007)[7] By introducing general Ramp surveys and Weibull degradation. According to Harris, inventory is basically broken down due to a constant demand.
Tripathy and Mishra [8] presented the model assuming allowable delays in payments based on cash flow. Karmakar and Choudhary [9] examined inventory models where demand for common ramp types represents demand quotas, partial deficits, and holding costs over time. They get two different guidelines taking into account stock filling into consideration. Using bottlenecks, there's no shortage. The inventory model of degradation was developed by Amutha and Chandraskaran[10]. This also takes into account the time and partial deficit.
Singh and Pattnayak [11] looked at models that exacerbate the product. In that deterministic model, the demand rate decreases exponentially and payments are also permitted. A deterministic model of product deterioration was developed by Roy. There, deterioration is currently proportional and demand is accepted as a selling price function. The proposed model allows for late payments and assumes inflation.
Anchal et al.12] presented a non-inhaled waste model with learning effects. In their models, bottlenecks arise and partially advance. Degradation rates are assumed as a two-parameter female distribution in the proposed model. Maragatham and Palani
[13] presented a deterministic inventory model of demand rates as a function of sales price. In their models, bottlenecks occur at lead time. Duari and Chakraborti [14] have formulated an order of the amounts in which a single warehouse is considered to be a deterioration of products with bottlenecks and demand rates.The EOQ model for product deterioration was by Khanra et al.[15]. They accepted demand as square time dependent and also gave acceptable payment delays. Min et al. handed over a production model that is considering product deterioration and demand quotas. They also take a delay in paying. Ouyang et al.[16] presented the model taking into account incomplete production processes and allowable delays in payments.
The current work has attempted to develop a mathematical model for a worsening inventory system. Demand rates depend on price and also take into account the delays allowed at the time of payment. Bottlenecks are also allowed. The cost of the learning curve and the resulting cost of ordering. Validate the model using numerical examples. Another sensitivity analysis was performed to determine the effect of the parameters involved in the final solution.
For this reason, many articles dealing with various existing models under different trade loans have appeared in the literature in recent years. Table-1 summarizes the most important assumptions of the models presented in the relative literature. However, it has been observed that the demand rate for new brands begins at the beginning of the season up to a certain moment and that the remaining time is constant. For example, demand rates rise during the growth phase and the market grows to a stable level, so demand remains constant by the end of the inventory cycle. The term "Ramp type" is used to present such a demand pattern.
Therefore, the ramp function rate function has two different time segments. In his first segment, demand is a function of time increase. However, demand remains constant for the second time. All ramp request functions between two time segments have at least one fragment point L, in which they are not distinguished. This non-differential fracture makes the analysis of the problem more complicated. This asked researchers to investigate inventory models for Ramp type demand samples.
Table1: Key assumptions of inventory models with permissible delay in payments.
Name of Authors
Demand rate
Allowing for deterioration
Allowing for shortages
Trade credit period
Goyal (1985)
Constant
No
No
Fixed
Dave(1985)
Constant
No
No
Fixed
Aggarwal and Jaggi (1995)
Constant
Constant rate
No
Fixed
Jamal et al.(1997)
Constant
Constant rate
Complete backlogging
Fixed
Chang and Dye (2001)
Constant
Constant rate
Time dependent
Fixed
Teng (2002)
Constant
No
No
Fixed
Chang et al. (2003)
Time dependent
Time dependent rate
No
Depending on the ordering quantity
Shah (2006)
Constant
Constant rate
Complete backlogging
Fixed
Huang (2007)
Constant
No
No
Fixed, but partially delay in payments
Jaber and Osman (2006)
Constant
No
Yes
Decision variable
Jaber (2007)
Increasing
No
No
Fixed
Jaggi et al.(2008)
Function of the credit- period
No
No
Fixed
Ouyang et al
.(2009)
Constant
Constant
No
Partially permissible delay in payments linked to order
quantity
Teng and Chang (2009)
Constant
No
No
Two levels of trade credit policy
Kreng and Tan (2010)
Constant
No
No
Two levels of trade credit policy
-
ASSUMPTIONS AND NOTATIONS:-
The model works upon the given notations and assumptions:
-
Assumptions
-
Only one item is involved in the inventory system.
-
Lead time is considered as zero.
-
The planning horizon is considered of infinite length.
-
Shortages are allowed to occur.
5.
Demand rate is price dependent and () =
, 0 <
-
A credit period which is fixed is provided by the supplier for settling the retailer's accounts.
-
Holding cost and ordering cost follows the learning curve.
-
Deterioration rate is assumed as constant.
-
-
Notations
-
q(t) : Inventory level at time t.
-
K= K(n): (0
+ 1 ) :
-
n: number of shipments.
-
: learning factor
-
A: the purchasing cost.
-
S : the shortage cost
-
d : deterioration cost.
-
: constant deterioration rate
-
p : price per unit
-
h(n): (0
+ 1): the holding cost per unit excluding charges of interest.
-
Ie : interest earn
-
Ip: interest charged.
-
M : permissible delay in settling accounts
-
Q : maximum inventory level.
-
T : length of order cycle.
-
T1 : time in which inventory level becomes zero, 0 1 .
-
TC (T1,T) : the total of inventory cost per unit time.
-
-
-
MATHEMATICAL FORMULATION AND SOLUTION
A mathematical model is formulated for perishable products where demand rate depends upon the price. As per the assumption, the planning period is considered of infinite length. The inventory level becomes zero, at time T 1 ,and then occurrence of shortages starts during the time period T1 to T.
Let q(t) represents the inventory level at any time t 0. The following differential equation describes the state of q(t) at
any time t is
()
+ ()() = , 0 (1)
The boundary conditions for the equation (1) is q(T1)= 0 at t= T1.
Under these boundary conditions, the solution of the equation (1) is
() =
+
[1 . ] (2)Inventory achieves its maximum level by putting q(0) =Q in equation(2).
Therefore,
= = (0) = + [ 1 ] (3)
Fig.-i: Graphical representation of inventory system
During time interval [0, T1], inventory is available in the system. Therefore holding cost during this time period is:
Holding Cost() = (
+ 1) 1 ()
0 0
Therefore, = (
+ 1) [1+1] (4)
0
2
Shortages start in system due to stock outs during time interval[1,]. Therefore, the shortage cost (SC) is:
= ()
1
= [
( 1)
2
(1) +
2
] . (5)
Deterioration cost (DC)is computed during period[0,1]is
Deterioration cost = () ()
1
= [
2
(1) 1] (6)
The Total cost can be calculated as follows
1
(1, ) = [ + + + ] (7)
If the interest charged and interest earned based upon cycle time T, then there can be three following conditions:
-
1
-
1 <
Case I:
The interest earned by the buyer's during the period 0 to M on the average sales earning rate
is 2.Further, the buyer has to settle the account at credit period M and must
2
arrange for the funds to pay the seller for the fixed inventory store at the pre-determined rate of interest, I p . Therefore, the
buyers paid interest for the unsold items after M is given by:
= [
(1 ) +
2
(1)
2 ]
Fig.-ii : inventory structure for case I
In the following equation1(1, )is the total cost for the case I is given as.
1
1(1, ) = [ + + + + 1] (8)
1
= [ + (0 +
1
1 + 1
) [ 2
] + [
+ 2
(1) 1]
[
( 1)
2
(1) +
2
] + [
(1 ) +
2
(1)
2 ]
Case II : <
2] (9) 2
In this case, no interest is paid by buyer during 1 < , but earns interest at an annual rate Ie during the period (0, M).
2
2
Therefore, the buyers earn interest is [ 1 + 1( 1)] and the paid interest is zero.
Fig.-iii : inventory structure for case II
In the following equation 2(1, )is the total cost for the case II is given as.
1
2(1, ) = [ + + + + 2] (10)
1
= [ + (0 +
2
1)
[1+1] + [2
+
2
(1)
1] [
(
1
)
2
(1)
+ ]
2
2
[ 1 + 1( 1]] (11)
Case III :
In this case, also no interest is paid by buyer as , but interest earned IE3 is [1( 1)] .
Fig.-iv: inventory structure for case III
In the following equation 3(1, )is the total cost for the case III is given as.
1
3(1, ) = [ + + + + 3] (12)
1 + (0 +
= [
1) [
1+1] + [
2
+
2
(1)
1]
](13)
[ ( ) ( ) + ] [ ( )]
1
1
2
2 1 1
-
-
SOLUTION PROCEDURE
Our purpose is to obtain the minimal cost of the system. The necessary condition for minimizing the cost is:
(1, ) = 0 , (1, ) = 0 (14)
1
Provided that this equation satisfies the following conditions
2(1, )
1
2 > 0 ,
2(1, )
2 > 0
2
2(1, ) ( )
1
2(1, )
1
( 2
2(1, )
) ( 2
) < 0 (15)
By solving (14), the values of T1and T can be calculated and by using this optimal value, the minimal total cost of inventory system can be calculated.
-
Numerical Example For Case I :
Let us take T= 5.70914, h0= 4, p= 3, n= 1, = .02, k= 50000, p= 10, e= 2.67, = 0.18, T1= 0.913449, d= 0.4, S=1.4, A= 20, Ip = 0.15/year, M=.013year, Ie= 2, Then TC=362.7381961487
For Case II :
Let us take T= 5.70914, h0= 4, p= 3, n= 1, = .02, k= 50000, p= 10, e= 2.67, = 0.18,
T1= 0.913449, d= 0.4, S= 1.4, A= 20, Ip = 0.15/year, M= 5, Ie= 2. Then TC= 152.0891853310
For Case III:
Let us take T= 5.70949, h0= 4, p= 3, n= 1, = .02, k= 50000, p= 10, e= 2.67, = 0.18,
T1= 0.913449, d= 0.4, S= 1.4, A= 20, Ip = 0.15/year, M= 10, Ie= 2, Then TC= 27.886078
-
Sensitivity Analysis:
This section presents the sensitivity analysis in order to illustrate the proposed model. To show the variation of values of different parameters on optimal solution, sensitivity analysis has been done and tables are given below to show the effect of different parameters on the cycle length and the total cost.
Table 2: Effect the value of M on cycle length and total cost
M
Cycle length
Total cost
5
5.70914
75.6798
10
5.70949
75.6284
15
5.70983
75.5770
20
5.71017
75.5256
Table 3: Effect of deterioration rate on cost and cycle length.
No. of Shipments
T1
Cycle length
Total cost
1
0.913449
5.70914
75.6798
2
0.915031
5.70947
75.6676
3
0.915949
5.70966
75.6606
4
0.916597
5.70980
75.6556
5
0.917097
5.70991
75.6518
Table4: Effect of number of shipments (n) on optimal solution.
T1
Cycle length
Total cost
0.7
0.4615
2.9475
596.6431
0.8
0.4452
2.9430
599.4622
0.9
0.4308
2.9393
602.0433
1.0
0.4178
2.9362
604.4248
Graphical representation of the Model
Fig. -v: Total Cost vs Cycle Length and Total Cost vs M
Fig.-vi: Deterioration Rate vs Cycle Length and Deterioration Rate vs Total Cost
Fig vii: 3D graph of T1 vs. Cycle Length vs. Total Cost
All observations from Table (24) and Figure (57) are based on the results of calculations. Table 2 shows that as the value of M increases, the cycle length increases but the total cost value decreases. Table 3 observes it as the degradation rate, cycle length and total cost increase. Table 4 can be easily observed that vaues of T1 & T increase and total cost values decrease with increasing number of shipments. Similarly, diagram (57) shows the effects of degradation rate on the number of programs, learning factors, and cycle length or total cost. This model reflects the amount that should be given to the buyer an order quantity. Buyers want to accept the learning phenomenon that learns new tasks after repeated frequently, minimizing the total cost for more profits. In this article, after all values are obtained from three or more cases, we conclude that Case-I is suitable for the best solution. This case shows approximate values for all parameters.
-
CONCLUSIONS
In this article, a mathematical model was developed under the assumption
-
the demand quota is price dependent
-
the degradation rate is constant
-
late payments are permitted
-
bottle necks are permitted
-
including learning effects.
To minimize the total cost, OOQ (optimal ordinal quantity) and optimal cycle time are calculated. The diagrams of the above model provide the appropriate algorithms. Validate the results by taking into account examples of numerical values. Another sensitivity analysis is performed to determine the effect of the parameters involved in the final solution.
This model can be further expanded by taking more realistic assumptions such as inflation rates, partial deficits, and more. You can generalize the model to a stochastic demand pattern. We also were able to consider the effects of various degradation, such as weibull parameters and gamma distribution.
REFERENCES:
[1]. Jaggi, C.K., Goyal, S.K. and Goel, S.K. (2008) Retailers Optimal Replenishment Decisions with Credit-Linked Demand under Permissible Delay in Payments. European Journal of Operational Research, 190, 130-135. [2]. R. M. Hill, Inventory model for increasing demand followed by level demand, Journal of the Operational Research Society, Vol. 46, pp. 12501259, 1995. [3]. Mandal, B., Pal, A.K., 1998. Order level inventory system with ramp type demand rate for deteriorating items. Journal of Interdisciplinary Mathematics,Volume 1, Issue 1, pages 4966, 1998.
[4]. Wu, K. S. and Ouyang, L. Y. (2000). A replenishment policy for deteriorating items with ramp type demand rate. Proceeding of National Science Council ROC (A), 24, 279-286. [5]. Panda, S., Saha, S. and Basu, M. (2007). An EOQ model with generalized ramp type demand and Weibull distribution deterioration. Asia-Pacific Journal of Operations Research, 24, 93-109. [6]. Skouri, K., Konstantaras, I., Papachristos, S. and Ganas, I. (2009) Inventory Models with Ramp Type Demand Rate, Partial Backlogging and Weibull Deterioration Rate. European Journal of Operational Research, 192, 79-92. [7]. Deng, P. S., Lin, R. and Peter, Chu. P. (2007). A note on inventory models for deteriorating items with ramp type demand rate. European Journal of Operational Research, 178, 112-120. [8]. Tripathy, C.K., Mishra, U. Ordering policy for Weibull deteriorating items for quadratic demand with permissible delay in payments (2010).Applied Mathematical Sciences, 4 (41-44), pp. 2181-2191. [9]. Karmakar, B., & Choudhury, K. (2014). Inventory models with ramp-type demand for deteriorating items with partial backlogging and time-varing holding cost. Yugoslav Journal of Operations Research, 24(2), 249266. [10]. Amutha, R. and Chandrasekaran, E. (2013) An EOQ Model for Deteriorating Items with Quadratic Demand and Tie Dependent Holding Cost. International Journal of Emerging Science and Engineering, 1, 5-6. [11]. Singh, T., Mishra, P. J., & Pattanayak, H. (2018). An EOQ inventory model for deteriorating items with time-dependent deterioration rate, ramp-type demand rate and shortages. International Journal of Mathematics in Operational Research, 12(4), 423437. [12]. Anchal A., Isha S., & Smita R., (2016) A partial backlogging inventory model for no instantaneous decaying items under trade credit financing facility.Indian Journal of Science and Technology, 9-34, 1-11.
[13]. Maragatham, M., and Palani, R. An Inventory Model for Deteriorating Items with Lead-time price Dependent Demand and Shortages. Advances in Computational Sciences and Technology, 10(6), (2017), 1839-1847. [14]. Duari Kumar N., and Chakraborti, T. An order level EOQ model for deteriorating items ina single warehouse system with price dependent demand and shortages. American Journal of Engineering Research (AJER), 3,(2014), 11-16. [15]. Khanra, S., Ghosh, S. K., and Chaudhuri, K. S. An EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment. Applied Mathematics and Computation, 218(1),(2011), 1-9. [16]. Ouyang, L.Y., and Chang . Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging.International Journal of Production Economics, 144, (2013), 610-617.