A Comprehensive Analysis of Material Receiving, Storage, and Issuing Processes in Thermal Power Plant Stores
Pragalbha Sarve
MBA, School of Business, Indira University, Pune,India 411033 pragalbhasarve@gmail.com
Prof. Shrirang Sajanapwar
Professor of Practice MBA, School of Business, Indira University,
Pune, India 411033 shrirang.sajanpwar@indirauniversity.e du.in
Dr. Manisha Maddel
Associate Professor & Guide, School of Business,
Indira University,
Pune, India-411033 manisha.maddel@indiraisbs.edu.in ORCID: 0009-0008-1720-2959
Abstract – This research study explores the stores and inventory management practices at Adani Power Limiteds 3,300 MW Tiroda thermal power station, examining how warehouse operations directly support power generation maintenance readiness. Grounded in established Operations and Supply Chain Management frameworks, the study addresses the critical role of material availability in minimizing plant downtime across electrical, mechanical, instrumentation, and civil maintenance departments. The primary objectives of the study are: (1) to examine inbound material receiving practices, including gate entry, inspection, and discrepancy handling; (2) to evaluate storage strategies and material handling for various inventory categories; (3) to analyze the internal material issuing process from Material Requisition Slips to department-wise staging and transport; and (4) to identify key operational control points and recommend practical improvements. Adopting a descriptive, observational case study design based on an on-the-job training internship, primary data were gathered through direct process observation and staff interactions, while secondary insights were drawn from corporate annual reports and industry literature without accessing restricted enterprise databases.
The major findings indicate that the Stores Department effectively manages physical and documentation flows through structured gate entry, thorough quantity verifications, and systematic vendor discrepancy resolutions. Storage practices successfully utilize standard racks, locked two-key shelving for sensitive brass items, open-air yards for oversized materials, mechanical forklifts, and electronic fuel- dispensing controls to maintain asset security and accountability. Furthermore, the internal issuing workflow operates efficiently from SAP stock searches and approvals to tailored vehicle allocation. The study concludes that treating receiving, storage, and issuance as a unified operating system safeguards inventory accuracy and optimizes plant availability. Practical suggestions include implementing barcode or RFID scanning during receiving to enhance real-time SAP visibility, establishing formal digital access logs for controlled lockers, standardizing Material Requisition Slip timelines for smoother staging, and strengthening joint digital discrepancy reporting protocols
with suppliers to streamline financial processing and supply chain resilience.)
Keywords – Stores and Inventory Management, Material Receiving and Verification, Warehouse Storage Practices, Internal Material Issuing Process, Thermal Power Plant Operations, Supply Chain Control Points.
-
INTRODUCTION
This project examines the critical stores and inventory management practices at Adani Power Limited through an intensive on-the-job training (OJT) internship conducted at the 3,300 MW Tiroda thermal power station in Gondia, Maharashtra. In a large-scale power generation facility where continuous operations depend heavily on the seamless execution of electrical, mechanical, and instrumentation maintenance, the availability of precise materials at the right time is paramount. Consequently, the Stores Department functions not merely as a passive warehouse, but as a vital operational service link that bridges external suppliers with internal maintenance teams, ensuring plant reliability, asset uptime, and operational continuity.
Methodologically structured as a descriptive, observation- based case study, this research tracks the complete lifecycle of materials from inbound arrival to internal issuance. The investigation details initial gate entry, security checks, unloading, quantity verification, rigorous inspection procedures, and discrepancy handling for incoming supplier shipments. Furthermore, it maps the outbound workflow from the generation of an official Material Requisition Slip through stock search, picking, department-wise staging, and final transportation. Alongside these primary workflows, the study evaluates essential supporting controls such as rack configurations, controlled lockers, open-air storage for heavy items, forklift-based material handling, fuel dispensing protocols, and third-party scrap disposal mechanisms.
Ultimately, this study aligns practical observations with established Operations and Supply Chain Management frameworks to evaluate how rigorous inventory controls bolster plant safety and efficiency. By treating these receiving, storage, and issuing procedures as an integrated operating system rather than isolated warehouse activities, the research identifies key operational control points and offers practical
recommendations for enhancing inventory accuracy and process accountability.
-
LITERATURE REVIEW AND THEORITICAL BACKGROUND
-
Literature Review
Adhikary and Jana (2019) examine integrated optimization models for production, preventive maintenance, and spare parts inventory. Ahamed et al. (2012) apply supply chain tools to thermal power plants, while Ardiansyah and Pratiwi (2024) evaluate warehouse inventory control procedures using SAP. Boniface et al. (2013) and Onyesolu et al. (2018) focus on automated inventory control and dynamic supply chain systems for power utilities in Nigeria. Ermawanto and Kurniati (2021) explore spare-part warehouse management, and Gao (2006) reviews utility-focused spare parts inventory techniques. Gill et al. (2016) provide a literature review on inventory management frameworks, echoing early cost-saving principles outlined by Hefter (1980). fraz et al. (2025) present a systematic review on spare parts classification and warehousing from a maintenance perspective, and Lailiyah et al. (2025) analyze min-max stock control methods. Macfarlane (1985), Scala (2011), and Scala et al. (2009) investigate nuclear and utility spare parts management and decision trade-offs. Nesti et al. (2023) apply class-based storage methods in power plant warehouses, while Raju et al. (2013) study RFID tracking in power project environments. Saran and Dhaneesh (2026) review inventory control techniques at BHEL. Finally, Santoso (2017), Trisnawati et al. (2018), and Zhao and Dong (2016) optimize spare parts policies and total cost systems for specific thermal power plants.
-
Theoretical Framework and Background Theory
The theoretical framework underpinning this study integrates core concepts from Operations and Supply Chain Management (OSCM), specifically focusing on warehouse operations, inventory control, and maintenance-driven logistics within capital-intensive industrial settings. In thermal power generation, the primary mandate is ensuring continuous, reliable asset operation. Consequently, the theoretical positioning relies on treating the Stores Department not as an isolated repository, but as an integrated internal supply chain nexus that bridges external suppliers with internal maintenance departments. Key foundational theories and models relevant to this framework include:
Material Lifecycle Management: Tracing materials from inbond entry, receiving, physical verification, and put-away to internal requisition, picking, staging, and final issuance. This perspective emphasizes that errors at any node (such as receiving discrepancies or mislabeled storage locations) propagate through maintenance planning and financial documentation.
Inventory Classification and Storage Strategy: Grounded in systematic warehousing principles, this involves segmenting inventory based on physical characteristics, value, and security requirements (e.g., standard racks for general spares, secure two-key lockers for sensitive components, and open-air storage for heavy assets) to optimize handling and asset protection.
Internal Logistics and Demand Fulfillment: Applying pull-system dynamics where internal maintenance demands (Electrical, Mechanical, Instrumentation, and Civil) trigger
formalized workflows via Material Requisition Slips (MRS), driving structured picking, staging, and load-matched transport allocation.
Control Point Theory: Utilizing layered administrative and physical controlsranging from gate entry authorization and quantitative inspection verifications to electronic fuel dispensing and third-party scrap recoveryto mitigate operational, financial, and security risks across the supply chain.
-
-
MATERIALS AND METHODS
This study adopts a descriptive, observational case study design based on practical exposure and process mapping within the Stores Department at Adani Power Limited, Tiroda. Because the project was conducted during an on-the-job training (OJT) internship rather than as a controlled empirical experiment, direct process observation and experiential learning serve as the primary evidence base.
The research framework follows the physical and informational lifecycle of materialstracing inbound supplier deliveries through gate entry, inspection, quantity verification, and put-away, as well as outbound internal flows from Material Requisition Slips (MRS) to picking, staging, and delivery. Primary information was gathered through active observation of daily warehouse tasks, explanations provided by department personnel, and participation in authorized workflow activities. Secondary data were compiled from official company documents, annual reports, industry publications, and academic literature. To maintain data integrity and confidentiality, no restricted SAP transactions or proprietary database logs were accessed. The sampling approach is purposive and experience-based, focusing on the specific operational activities witnessed rather than a statistical employee population.
Objectives of the Study
The objectives of the study are as follows:
-
To study the material receiving practices followed in the Stores Department at Adani Power Limited, including gate entry, receiving, inspection, quantity verification and discrepancy handling.
-
To understand the storage and inventory management practices used for different categories of materials, including rack storage, controlled storage, open storage and material handling.
-
To analyze the internal material issuing process from Material Requisition Slip through approval, stock search, picking, department wise staging and transportation to the requesting department.
-
To identify operational observations and control points in the Stores process and recommend practical improvements for inventory accuracy, material visibility, handling efficiency and process accountability.
A. Analytical Approach
This study separates three distinct levels of evidence direct observation, company/publicly reported information, and management interpretation. Because transaction-level Stores data were not authorized for use, the analysis focuses on process relationships, workflow sequences, and improvement opportunities rather than claiming measured savings or service-level performance. The analysis examines
practical observations against the four project objectives using a descriptive and process-based framework. Quantitative company and sector figures are utilized only when they are publicly reported or explicitly identified as internship observations. The evaluation centers on control points, storage logic, internal responsiveness, and the relationship between physical materials and information records, deliberately avoiding the fabrication of unmeasured performance percentages, cycle times, or cost savings.
-
-
DATA ANALYSIS AND DISCUSSION
table i. Material Receiving Practices
Observation Observation
Operational Meaning
Operation
al Meaning
Potential KPI
Observation
Physical counting
Confirms
received quantity
Receiving
quantity accuracy
Physical counting
Supplier notification
Creates accountabil
ity
Discrepan cy closure
time
Supplier notification
Video/presen ce evidence
Supports dispute resolution
Percentage of discrepanc ies with
evidence
Video/presen ce evidence
Verified quantity for invoice/paym ent
Links physical and financial
control
Invoice exception rate
Verified quantity for invoice/paym ent
Table 1: Material Receiving Practices
The table analyzing material receiving practices demonstrates that inbound warehouse operations function as a critical preventive control gate rather than a passive acceptance point. Physical counting confirms whether the actual delivered quantities match supplier documentation, while formal vendor notifications establish clear accountability when discrepancies occur. The use of video or witness evidence supports objective dispute resolution, and linking the verified physical quantity directly to financial invoice approval bridges warehouse logistics with financial control. Tracking key performance indicators (KPIs) like discrepancy closure times and invoice exception rates helps streamline inbound flows and reduce administrative errors.
table ii. Storage and Inventory Management Practices
Storage Type Storage
Type
Observed Use
Observed Use
Control Consideration
Storage Type
Racks
Regular materials
Labeling, safe stacking and
location accuracy
Racks
Storage Type Storage
Type
Observed Use
Observed Use
Control Consideration
Storage Type
Two key locker
Selected brass/sensitive
items
Access control and
accountability
Two key locker
Open area
Oversized pipes, rods and similar
items
Space, weather protection and
safe handling
Open area
Forklift supported areas
Heavy materials
Load safety and movement control
Forklift supported areas
Table 2: Storage and Inventory Management Practices
The table detailing storage and inventory management highlights a differentiated approach based on the physical characteristics, value, and security requirements of different items. Standard racks accommodate regular operational spaes with an emphasis on labeling and safe stacking, whereas sensitive or high-value brass components are kept under secure two-key locker custody. Bulky, oversized items are placed in open-air yards requiring specialized protection, and heavy materials utilize forklift-supported areas to ensure load safety and movement control. Maintaining strict alignment between these physical locations and system records is vital to prevent misplacement and minimize retrieval delays for maintenance teams.
table iii. Internal Material Issuing Process
Potential KPI
Potential KPI
Definition
Definition
Why It Matters
Potential KPI
MRS to issue time
Time from approved MRS to issue
Measures Stores responsivenes
s
MRS to issue time
Picking accuracy
Correct items/quantitie
s picked
Reduces rework
Picking accuracy
Staging accuracy
Material placed in correct department
area
Supports handover
Staging accuracy
Delivery
turnaroun d
Issue to
department receipt
Measures
internal logistics
Delivery
turnaroun d
Table 3: Internal Material Issuing Process
The table evaluating the internal material issuing process maps out a controlled chain of custody connecting maintenance demand with warehouse execution. Initiating workflows through Material Requisition Slips (MRS) leads through system stock searches, approvals, physical picking, and department-wise staging for electrical, mechanical, instrumentation, and civil maintenance units. Tailoring internal transport vehicles to the exact size, weight, and
quantity of the load ensures efficient delivery. Monitoring operational metricssuch as MRS-to-issue turnaround time, picking accuracy, staging precision, and delivery turnaroundallows management to evaluate internal logistics responsiveness and minimize equipment downtime.
table iv. Operational Observations and Control Points
Control Point Control
Point
Primary Risk Addressed
Primary Risk Addressed
Observed/Relev ant Control
Control Point
Gate entry
Unauthorized vehicle/material
movement
Entry procedure
Gate entry
Receivi ng
Wrong or
damaged material
Inspection
Receivi ng
Countin g
Quantity discrepancy
Physical verification
Countin g
Storage
Loss/misplacem ent
Designated locations and controlled
access
Storage
Internal issue
Unauthorized release
MRS and approval
Internal issue
Transpo rt
Wrong/unsafe movement
Vehicle selection by load
characteristics
Transpo rt
Table 4: Operational Observations and Control Points The table summarizing operational observations and
control points illustrates that a multi-layered control framework is essential across the entire material lifecycle to mitigate operational, security, and financial risks. Each stageranging from initial vehicle gate entry procedures and inbound material inspections to physical quantity verifications, designated storage locations, MRS approvals, and load-matched transportaddresses specific vulnerabilities. Because no single control operates in isolation, combining physical discipline with robust information system tracking ensures total process accountability and provides clear pathways for measurable operational improvements.
-
Findings, conclusions and suggestions
The findings of this descriptive case study reveal that the Stores Department at Adani Power Limited, Tiroda, operates as an integrated supply chain nexus connecting external suppliers with internal maintenance teams to ensure power plant reliability. Inbound material receiving processes effectively capture physical and documentation flows through structured gate entry, thorough inspections, and quantitative verifications, utilizing systematic discrepancy handling and vendor notifications to safeguard inventory accuracy and invoice processing. Storage and inventory management practices successfully segregate materials based on physical characteristics and control requirements, utilizing standard rack storage for general items, locked two-key shelving for sensitive brass components, and open-air storage for oversized assets, while deploying forklifts for heavy handling and maintaining electronic-lock authorizations for internal fuel
dispensing. Furthermore, the internal material issuing process operates reliably through a disciplined sequencefrom Material Requisition Slip generation and authorized stock location checks in SAP to physical picking, department-wise staging for Electrical, Mechanical, C&I, and Civil maintenance units, and appropriate vehicle allocation for internal transport. Finally, operational observation highlights crucial control points across the material lifecycle, demonstrating that structured inventory visibility, location discipline, and third-party reverse logistics for scrap management collectively enhance process accountability, minimize handling inefficiencies, and support uninterrupted generation asset uptime.
-
Findings
A The findings of this descriptive case study reveal that the Stores Department at Adani Power Limited, Tiroda, operates as an integrated supply chain nexus connecting external suppliers with internal maintenance teams to ensure power plant reliability. Inbound material receiving processes effectively capture physical and documentation flows through structured gate entry, thorough inspections, and quantitative verifications, utilizing systematic discrepancy handling and vendor notifications to safeguard inventory accuracy and invoice processing. Storage and inventory management practices successfully segregate materials based on physical characteristics and control requirements, utilizing standard rack storage for general items, locked two-key shelving for sensitive brass components, and open-air storage for oversized assets, while deploying forklifts for heavy handling and maintaining electronic-lock authorizations for internal fuel dispensing. Furthermore, the internal material issuing process operates reliably through a disciplined sequencefrom Material Requisition Slip generation and authorized stock location checks in SAP to physical picking, department-wise staging for Electrical, Mechanical, C&I, and Civil maintenance units, and appropriate vehicle allocation for internal transport. Finally, operational observation highlights crucial control points across the material lifecycle, demonstrating that structured inventory visibility, location discipline, and third-party reverse logistics for scrap management collectively enhance process accountability, minimize handling inefficiencies, and support uninterrupted generation asset uptime.
-
Conclusions
H This study concludes that the Stores Department at Adani Power Limited, Tiroda, functions as an essential operational backbone that directly safeguards power plant maintenance readiness and asset availability. By treating inbound receiving, warehousing storage, and internal issuing as a unified operating system rather thn isolated warehouse activities, the department successfully aligns practical workflows with core Supply Chain Management principles. The evaluation of inbound processes confirms that structured gate entry, physical quantity verification, and systematic discrepancy handling protect inventory record accuracy and streamline financial invoice processing. Furthermore, the strategic segmentation of storageutilizing standard racks, controlled two-key lockers for sensitive components, and open-air yards for heavy assetscombined with mechanical forklift handling and rigorous electronic controls for internal fuel dispensing, ensures both material preservation and accountability. The internal material requisition and issue
cycle demonstrates high operational discipline, moving efficiently from Material Requisition Slip approvals and location checks to department-wise staging and tailored transport allocation for maintenance teams. Ultimately, identifying key control points across this material lifecycle highlights that robust inventory visibility, process accountability, and third-party scrap recovery are vital for minimizing downtime and maximizing generation efficiency.
-
Suggestions
Based on the operational workflow observed at Adani Power Limited, the following practical recommendations are suggested for key stakeholders:
-
For Stores Management and Warehouse Personnel, implement digital barcode or RFID scanning during receiving and put-away to eliminate manual counting errors and enhance real-time location visibility in SAP. This will accelerate stock searches and reduce picking times for maintenance teams.
-
For Internal Maintenance Departments (EMD, MMD, C&I, and Civil), streamline advance forecasting and standardize Material Requisition Slip (MRS) timelines to minimize emergency requisitions, allowing stores to optimize department-wise staging and forklift allocation efficiently.
-
For Plant Administration and Safety Teams, conduct regular operator training and routine safety audits for material handling equipment (forklifts) and establish formal digital access logs for two-key controlled lockers to further strengthen physical accountability.
-
Finally, for Vendor Management and Procurement, integrate joint digital discrepancy reporting protocols with suppliers to expedite the resolution of short-shipments and ensure seamless invoice processing, benefiting both financial control and overall supply chain resilience.
-
-
Implications
This study carries significant implications for various stakeholders within a thermal power generation environment. For Plant Management and Operations Leadership, the insights highlight that treating the Stores Department as an integrated operating system rather than a passive warehouse directly enhances maintenance readiness, reduces equipment downtime, and improves overall plant asset uptime. For Stores Personnel and Warehouse Staff, the analysis emphasizes the importance of rigorous inventory discipline, systematic location management, and controlled access mechanisms (such as two-key lockers and electronic fuel controls) in minimizing material loss and boosting daily operational efficiency. For Internal Maintenance Teams (EMD, MMD, C&I, and Civil), streamlined receiving, accurate stock visibility, and structured department-wise staging ensure timely material availability, enabling faster fault resolution and smoother execution of maintenance tasks. Finally, for External Suppliers and Procurement Teams, transparent receiving, quantitative verification, and structured discrepancy-handling protocols foster better vendor accountability, quicker dispute resolution, and smoother invoice processing.
ACKNOWLEDGMENT
I express my sincere gratitude to Adani Power Limited, Tiroda, and my faculty mentor, Shrirang Sajanapwar Sir, for their invaluable guidance, support, and opportunity to conduct this OJT study.
REFERENCES
-
Adhikary, D., & Jana, D. (2019). Integrated-optimization of production, preventive maintenance and spare parts inventory of continuous operating series systems. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/668e9162d3cc6f23d9a1a661b bb3836747ae31f4
-
Ahamed, S., Rangajanardhana, G., & Nagesh, E. (2012). Application of supply chain tools in power plant: A case of Rayalaseema Thermal Power Plant. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/a8dd0d89e3e9e6c8ceee63852 7be3c3f11011245
-
Ardiansyah, O., & Pratiwi, A. (2024). Inventory management procedure through system application and product (SAP) in the warehouse division of PT Geo Dipa Energi Unit Dieng 1. [Conference publication details not available in retrieved record]. https://conference.ut.ac.id/index.php/proceeding_iscebe/article/downl oad/3857/1445
-
Boniface, E., Nwokoye, H., & Chukwuemeka, A. J. (2013). Automated inventory control system for Nigeria Power Holding. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/b056e13a485aa27cc42e72b20 72bafaf64e2d589
-
Ermawanto, D., & Kurniati, N. (2021). Examining inventory management for spare-part warehouse. [Publication details not available in retrieved record]. https://index.ieomsociety.org/index.cfm/article/downloadArticle/ID/7 618
-
Gao, Z.-P. (2006). Spare parts inventory management for power utilities. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/0c9670062bde6e4068ce870e1 449dc07ef0ce0af
-
Gill, S., Khullar, P., & Singh, N. (2016). A review on various approaches of spare parts inventory management system. Indian Journal of Science and Technology, 9(48).* https://doi.org/10.17485/ijst/2016/v9i48/101473
-
Hefter, G. (1980). Improved spare-parts management can yield outstanding savings. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/0112a2bb4a98ac8322a5deb59 02c9ed623cb9435
-
fraz, M., Tebrizcik, S., Aktepe, A., Ersöz, S., & Türker, A. K. (2025). A systematic literature review on spare parts classification, inventory and warehouse management from maintenance-repair perspective. [Journal details not available in retrieved record]. https://dergipark.org.tr/en/download/article-file/3934021
-
Lailiyah, W., Pulansari, F., & Dewi, S. (2025). Analysis of spare parts inventory control using the min-max stock method and continuous review. [Journal details not available in retrieved record]. https://newinera.com/index.php/JournalLaMultiapp/article/download/ 2011/1916
-
Macfarlane, I. (1985). Effective inventory management for nuclear power plants. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/d8fd496b791e788368e2e6540 5ee28ec5a5256cd
Nesti, L., Elviana, R., & Ramadhani, J. (2023). Rancang bangun sistem manajemen gudang sparepart di PLTU PT. XYZ dengan metode class- based storage. [Journal details not available in retrieved record].
https://ejournal.uin- suska.ac.id/index.php/jti/article/download/22310/9007
Onyesolu, M., Abara, J. C., Chukwuneke, C., & Asogwa, D. (2018). Modeling a dynamic supply chain management system for an utility company in Nigeria. Journal of Software Engineering and Applications, 11(6).*
https://content.scirp.org/pdf/jse_2018061114275584.pdf
Raju, K., Sachan, D., & Biswas, S. (2013). Application of RFID based inventory management system in power project sites. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/3b0470ec7ad403e3ab03e5886 45f7fb0ce1fb1eb
Saran, S., & Dhaneesh, D. V. (2026). Inventory control techniques management: Bharat Heavy Electricals Limited (BHEL). International Journal of Current Projects in Engineering and Operations, [volume and issue not available in retrieved record]. https://ijcope.org/wp- content/uploads/2026/05/SARAN_11724500089.pdf
Santoso, A. S. (2017). Penentuan kebijakan pengendalian persediaan spare part pada mesin pulverizer: Studi kasus PLTU PT IPMOMI Paiton. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/3d2e969c839d01a40b2afaa3d 9eb896b9ff402ba
Scala, N. (2011). Spare parts management for nuclear power generation facilities. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/3a39727879104d57feece9588 8444643a0c56364
Scala, N., Needy, K., & Rajgopal, J. (2009). Decision making and tradeoffs in the management of spare parts inventory at utilities. [Publication details not available in retrieved record]. https://www.semanticscholar.org/paper/b039cfc31857473d36948853 9d4e155619a77baf
Trisnawati, U., Wicaksono, P. A., & Pujotomo, D. (2018). Rancangan pengendalian persediaan spare part: Studi kasus PT. Indonesia Power Unit Pembangkitan Semarang. [Publication details not available in retrieved record].
https://www.semanticscholar.org/paper/7f24bf9f51e38fe4777bb60a72 539fe9e22f6887
Zhao, J., & Dong, W. (2016). The coal-fired power plant based on minimizing the total cost inventory system optimization research. [Publication details not available in retrieved record]. https://www.atlantis-press.com/article/25867274