Project Management Information Systems for Construction of Thermal Power Plant : A Case Study with Special Reference to National Thermal Power Corporation Ltd.,India


Project Management Information Systems for Construction of Thermal Power Plant : A Case Study with Special Reference to National Thermal Power Corporation Ltd.,India
Authors : Dr. D. K. Choudhury
Publication Date: 07-04-2014

Authors

Author(s):  Dr. D. K. Choudhury

Published in:   International Journal of Engineering Research & Technology

License:  This work is licensed under a Creative Commons Attribution 4.0 International License.

Website: www.ijert.org

Volume/Issue:   Vol. 3 - Issue 3 (March - 2014)

e-ISSN:   2278-0181

Abstract

In construction management, it is imperative to have an unique project management information system(PMIS) for completion of the project without any time and cost overrun. In this study, we have illustrated the project management models and PMIS suggested by different researchers. National Thermal Power Corporation Ltd.(NTPC) is the main power producer in India. The organisation has set up 16 thermal power plants in the country and most of the plants were set up within the scheduled time. A case study was conducted at NTPC to find out the PMIS used by the organisation for implementing their project and to what extent this PMIS fulfils the basic requirements laid down by different researchers. The second purpose of this study was to empirically assess the quality of the PMIS used by NTPC in the light of the evaluation parameters suggested by researchers and mentioned in this research paper.

Citations

Number of Citations for this article:  Data not Available

Keywords

Key Word(s):    

Downloads

Number of Downloads:     1741
Similar-Paper

Call for Papers - May - 2017

        

 

                 Call for Thesis - 2017 

     Publish your Ph.D/Master's Thesis Online

              Publish Ph.D Master Thesis Online as Book